My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
301
>
2300 - Underground Storage Tank Program
>
PR0231345
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 2:10:38 PM
Creation date
10/11/2018 2:12:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231345
PE
2381
FACILITY_ID
FA0003713
FACILITY_NAME
CHEVRON #95775 MCCOMBS* (INACT)
STREET_NUMBER
301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04514002
CURRENT_STATUS
02
SITE_LOCATION
301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Health and Safety Plan <br />Page 14 <br />7.1 Work Zones <br />Work zones are designated to prevent employees, visitors, and the <br />surrounding environment from exposure to contamination during all aspects <br />of site remediation activities. All work zones and support areas will be <br />established by Musco Excavators. Movement of personnel and equipment <br />between zones and on and off site will be controlled by means of designated <br />access points. Minimum personal protective equipment for work in each zone <br />is described in Section 5.0. <br />7.1.1 Work Areas <br />The work areas encompass the surface areas around the boundary of the <br />property. It is anticipated that this will be a Level D area and be <br />utilized during invasive operations. <br />7.2 Safe Work Practices <br />Safe work practices, which must be followed by all site workers, include: <br />* Eating, drinking, chewing gum or tobacco, and smoking are <br />prohibited in the work and decontamination areas. <br />* Do not sit or kneel in areas of obvious contamination. <br />* Hands and face must be thoroughly washed upon leaving the work <br />area. <br />* Repair or replace immediately any defective PPE. <br />* Prescription drugs must not be taken by personnel unless <br />specifically approved by a qualified physician. <br />* If respirators are required, facial hair that interferes with <br />the face-to-facepiece fit of the respirator will not be <br />permitted. <br />* Contact lenses will not be permitted to be worn when the <br />potential for chemical splash exists or when full face -piece <br />respirators are required. <br />* Personnel on site must use the buddy system; visual contact <br />must be maintained between team member at all times. <br />7.2.2 Daily Start -Up and Shutdown Procedures <br />The following protocols will be followed daily prior to start of work <br />activities: <br />
The URL can be used to link to this page
Your browser does not support the video tag.