Laserfiche WebLink
Electronic Code of Federal Regulations: Page 1 of 1 <br /> § 112.5 Amendment of Spill Prevention, Control, and Countermeasure Plan by owners <br /> or operators. <br /> t❑top <br /> If you are the owner or operator of a facility subject to this part,you must: <br /> (a)Amend the SPCC Plan for your facility in accordance with the general requirements in§112.7,and <br /> with any specific section of this part applicable to your facility,when there is a change in the facility <br /> design,construction,operation,or maintenance that materially affects its potential for a discharge as <br /> described in§112.1(b). Examples of changes that may require amendment of the Plan include,but are <br /> not limited to:commissioning or decommissioning containers;replacement, reconstruction,or movement <br /> of containers; reconstruction, replacement,or installation of piping systems;construction or demolition <br /> that might alter secondary containment structures; changes of product or service;or revision of standard <br /> operation or maintenance procedures at a facility.An amendment made under this section must be <br /> prepared within six months,and implemented as soon as possible,but not later than six months <br /> following preparation of the amendment. <br /> (b)Notwithstanding compliance with paragraph(a)of this section,complete a review and evaluation of <br /> the SPCC Plan at least once every five years from the date your facility becomes subject to this part;or, <br /> if your facility was in operation on or before August 16,2002,five years from the date your last review <br /> was required under this part.As a result of this review and evaluation,you must amend your SPCC Plan <br /> within six months of the review to include more effective prevention and control technology if the <br /> technology has been field-proven at the time of the review and will significantly reduce the likelihood of a <br /> discharge as described in§112.1(b)from the facility.You must implement any amendment as soon as <br /> possible,but not later than six months following preparation of any amendment.You must document <br /> your completion of the review and evaluation,and must sign a statement as to whether you will amend <br /> the Plan,either at the beginning or end of the Plan or in a log or an appendix to the Plan.The following <br /> words will suffice,"I have completed review and evaluation of the SPCC Plan for(name of facility)on <br /> (date),and will(will not)amend the Plan as a result." <br /> (c)Except as provided in§112.6,have a Professional Engineer certify any technical amendments to <br /> your Plan in accordance with§112.3(d). <br /> [67 FR 47140,July 17,2002,as amended at 71 FR 77291, Dec.26,2006;73 FR 74301, Dec.5,2008; <br /> 74 FR 58809, Nov. 13,2009] <br /> http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&sid=97ddc7a997643 8b969b 1 e7b86a59... 4/12/2010 <br />