Laserfiche WebLink
Attachment 2A <br /> U.S. ENVIRONMENTAL PROTECTION AGENCY <br /> ilk SUMMARY OF SPCC DEFICIENCIES <br /> ..�.. Onshore Facilities(Excluding drilling,production and workover) 2 <br /> Facility Name/Address:. /V t � 7 � Facility Start Date: <2Cx'x? TANK ; <br /> Inspector: Date: Z-u AAY ?�-:� SPCC#: I!S -yD/E <br /> Citation Deficiency Plan Field <br /> 112.3(x) No Spill Prevention Control and Countermeasures Plan <br /> 112.3(d); Plan not certified by a Professional Engineer(PE),not self-certified, or incomplete <br /> 112.6(a)(1)or(b)(1) <br /> 112.3(e)(1)or(2) Plan not maintained on site or not available for review <br /> 112.3(8) Plan self-certifled(or Tier I template used)though not eligible <br /> 112.5(a) No plan amendments)after change in:design,construction,operation,or maintenance <br /> 112.5(b) No evidence of five year review of pian by owner/operator <br /> 112.5(c), Technical amendments(s)not certified by a PE or self-certified <br /> 112.6(a)(2)or(b)(2) <br /> 112.6(b)(2) PE certified portions of Plan not certified by a PE following technical amendments <br /> 112.6(b)(3) Deviations from the SPCC rule requirements are not certified by a PE <br /> 112.7 No signed management approval of plan <br /> 112.7 Plan does not follow sequence or have a cross reference <br /> 112.7(a)(2) No or inadequate environmental equivalent for deviations from requirements <br /> 112.7(a)(3) No or incomplete facility diagram <br /> 112.7(a)(3)(i) No or incomplete listing of type of oil and storage capacity of containers <br /> 112.7(a)(3)(ii) No or inadequate description of discharge prevention measures <br /> 112.7(a)(3)(M) No or inadequate description of drainage controls <br /> 112.7(a)(3)(iv) Nolinadequate description of countermeasures for discharge discovery, response,cleanup <br /> 112.7(a)(3)(v) No or inadequate description of disposal methods for recovered materials <br /> 112.7(a)(3)(vi) No or incomplete contact list&phone numbers for response&reporting discharges <br /> 112.7(a)(4) No or inadequate procedures for reporting discharges <br /> 112.7(x)(5) No or inadequate procedures for use in an emergency <br /> 112.7(b)or Plan has inadequate or no prediction of equipment failure which could result in discharges <br /> 112.6(a)(3)(i) <br /> 112.7(c) No or inadequate containment and/or diversionary structures to prevent a discharge <br /> 112.7(d) No or inadequate demonstration that secondary containment is impracticable <br /> 112.7(d) No periodic integrity and leak testing of containers,valves and piping when impracticability <br /> is claimed for bulk storage containers <br /> 112.7(d)(1) No or Inadequate:contingency plan per 40 CFR part 109 or FRP under 112.20 <br /> 112.7(d)(2) No written commitment of manpower,equipment, and materials <br /> 112.7(e) Inspections and tests not in accordance with written procedures in Plan <br /> 112.7(e) Record of Inspections are not signed by facility supervisor <br /> 112.7(e) Record of inspections are not maintained for three years <br /> 112.7(1)(1) No training of oil-handling personnel on discharge prevention <br /> 112.7(1)(2) No designated person responsible for spill prevention <br /> 112.7(0(3) Spill prevention briefings are not conducted at least annually <br /> 112.7(g) No or inadequate description of facility security <br /> 112.7(h)(1) Loading/unloading rack drainage does not flow to containment <br /> 112.7(h)(1) Containment system does not hold at least the maximum capacity of the largest single <br /> compartment of any tank car or tank truck using the rack <br /> 112 7(h)(2) No Interlocked warning light,physical barrier system,or warning signs to prevent vehicular <br /> departure before complete disconnect from transfer lines <br /> Deficiencies found during the Inspection are marked with an"X" <br />