Laserfiche WebLink
W.O.# AST -670044 <br />Tanknology Inc. <br />11000N. MoPac Exprr_ssway, Suite 500 Austin, TX 78759 (800) 964-0010 Policy 100-29-A <br />JOB CLEARANCE FORM & Rev: D° <br />Revised: 1/24/2014 <br />SITE SAFETY CHECKLIST — OVF <br />Sit Name1#: <br />Sit <br />Street Address: <br />W.O. <br />Nwd- <br />U7oq �, �u,,� <br />u7oo&(7 <br />Am a Time: <br />Departure Time: <br />Travel Time: <br />Others on si <br />Date <br />9" IU <br />t1'k <br />/) 2 - ( 1 <br />Scop of Work and Tasks P rfomted (JSA's must be available for all tasks): <br />Scop <br />'f n,7 <br />s � <br />Repairs to Equipment r Parts Provided: <br />Follow-up actions required, equipment isolated, comments: <br />PPE - PERSONAL MTECTTVE EQUIPMENT REQUIR Check items used or mark - if not a !!cable <br />Safety Vest <br />Safety Glasses <br />XX Gbves <br />1 <br />L Hearing Protection <br />Steel Toe Boots <br />❑ Splash Goggles <br />❑ Hard Hat <br />F1 Other <br />✓ PRE-TEST PROCEDURES (Check each item completed or mark — ff not applicable) <br />1. ❑ Discuss safety procedures with site personnel. Nearest hospital: <br />2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br />3. ❑ Secure entire work area with barricades (cones, flags, and caution tape, pennant flags, or other perimeter guard). <br />4. ❑ Place fire extinguishers and "No Smoking' signs in the work area. <br />5. 'D 'Implement LockoutfTagout per API 1646 (when accessing product piping during tasks) <br />❑ All applicable equipment disabled during test(s). ❑ Secure the circuit breaker(s) with lockout devices and tags. <br />❑ Secure nozzles with "Out of Service' bags and nylon ties. —' Verify LOTO is complete by trying rate pumps. <br />❑ Close ball valves or check valves on product piping. ❑ Discon ct electrical "bayonet nn or from the STP(s). <br />Le nc Na echni an ignalure <br />General Safety Checks: <br />i✓ <br />All site personnel have been informed. U �1 <br />Fuel delivery has been informed. S 6e ey mental ve eme rat ve Signa ure <br />Is a fuel delivery due today? <br />LOTO procedures have been discussed and agreed. A Al S s <br />Work areas barricaded to protect workers, staff & public. <br />POST-TEST POST-TEST PROCEDURES(Check each Item completed or mark ^ if not applicable)each item completed or mark - if not applicable) <br />_✓ <br />1. ❑ Remove all "LockoutfTagout" devices. <br />2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br />❑ Leak Detector Threads on STP S ❑ Functional Elements & Relief Screws <br />3. C Install lead wire seal on all test plugs & leak detectors that were serviced - <br />Count LD threads: L1 L2_ L3_ L4_ 1-5 L6 <br />4. ❑ Check following components operational: ❑ ATG probes, sensors, & caps <br />❑ Ball floats, dry breaks & caps ❑ Cathodic protection operational <br />❑ Containment sumps are dry ❑ Dispensers & POS operational <br />❑ Dispenser panels are replaced ❑ Drop tubes, fill adapters & caps <br />❑ Leak detectors & vent tubes ❑ Manhole covers and sump lids <br />❑ Monitoring system IS operational ❑ Shear valves are open <br />❑ Siphon lines and manifold valves ❑ Siphon lines and manifold valves <br />❑ STP fittings and bayonet connectors ❑ Vents (not capped, pluggisolated) <br />5. ❑ Remove barricades. <br />ech 'an c <br />ead ec n.dan Signature <br />General Safety Checks: <br />Work area has been left tidy & safe. <br />FZR,-. <br />ne a to ive signature <br />Site staff are aware of work status including any remaining isolation. ntative N <br />Changes to equipment are documented and communicated.All <br />incidents, near incidents, and unsafe situations reported. <br />Stte Representative Comments: <br />COMPANY CONFIDENTIAL ® Tanlmology Inc., 2011. All Rights Reserved. <br />Tinted copies of dtis document are uncontrolled. 'px current version is available in the Tanknol On -Line I)oetrraart Control S m <br />