My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 4:47:44 PM
Creation date
10/11/2018 2:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W.O.# AST-6702581 <br /> Tanknology Inc. <br /> 11000 N.MoPac Ilxpres—ay,Suite 500 Austin,TX 79759 (800)964-0010 Policy 1U0-29-A <br /> JOB CLEARANCE FORM& R` <br /> Revised;1/24/2014 <br /> SITE SAFETY CHECKLIST—OVF <br /> Site Namerd Street Address: W,O.# <br /> y7 j /=i T� CT <br /> Yl a l - tl5i 7726-2, <br /> C/ 5 — v <br /> Arrival Time: Departure Time Travel Time: Others on site: Dale <br /> (2y 1 io ,�): - <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> T 7 <br /> Repairs to Equipme or Parts rovided: <br /> Follow-up actions required,equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED Check items used or mark—if notapplicable) <br /> Safety Vest 1---66fety Glasses 'I✓,Gloves Hearing Protection <br /> _L—Steel Toe Boots Splash Goggles Hard Hat Other <br /> ✓ PRE-TEST PROCEDURES (Check each item completed or mark if not applicable) <br /> 1. V_—�Discuss safety procedures with site personnel. Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. G' Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5. ❑ Implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> All applicable equipment disabled during test(s). 1 Secure the circuit breaker(s)with lockout devices and tags. <br /> Secure nozzles with"Out of Service"bags and nylon ties. Verify LOTO is complete by trying to operate pumps. <br /> Close ball valves or check valves on product piping. _i Disconnect electrical"bayonet"connector from the STP(s). <br /> SIGN IN Lead Technician Name ea Te hnician Signature, <br /> General Safety Checks: <br /> All site personnel have been informed. Fr b <br /> Fuel delivery has been informed. ae epresen live Name e e se r ig wr <br /> Is a fuel delivery due today? <br /> LOTO procedures have been discussed and agreed. . <br /> Work areas barricaded to protect workers,staff&public. I have discussed job cl a form with tee nician. <br /> ✓ POST-TEST PROCEDURES(Check each item completed or mark ^- if not applicable) <br /> 1. Remove all"Lockout/Tagout"devices. <br /> 2. Run all pumps and verify there are no leaks: Impact Valve Test Ports under dispensers <br /> __ Leak Detector Threads on STP's C Functional Elements&Relief Screws <br /> 3. Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2_ L3_ L4 L5 L6_ <br /> 4. Check following components operational: I I ATG probes,sensors,&caps <br /> Ball floats,dry breaks&caps Ll Cathodic protection operational <br /> Containment sumps are dry -! Dispensers&POS operational <br /> Dispenser panels are replaced Drop tubes,fill adapters&caps <br /> Leak detectors&vent tubes Manhole covers and sump lids <br /> Monitoring system is operational C Shear valves are open <br /> Siphon lines and manifold valves LI Siphon lines and manifold valves <br /> _ STP fittings and bayonet connectors Ll Vents(not capped,plugged or isolated) <br /> 5. Remove barricades. <br /> SIGN OUT&Operator Verification of Work OVF Lead Technician Name �echnicianlure <br /> General Safety Checks: <br /> Work area has been left tidy&safe. Jt <br /> Site staff are aware of work status including any remaining isolation. i e epres orale a Si n 've Signature <br /> Changes to equipment are documented and communicated. /J <br /> S. <br /> All incidents,near incidents,and unsafe situations reported. L/ - r <br /> Site epreaentalive Comments: <br /> COMPANY CONFIDEN'rIAL c),ranknoloL,v Inc.,2011.All Rights Reserved. <br /> Tinted copies of this document are uncontrolled. The current version Is available in the TanknoloEy On-Linc Document Control Svstem <br />
The URL can be used to link to this page
Your browser does not support the video tag.