Laserfiche WebLink
VALLEY PACIFIC PETROLEUM SERIVICES, INC — STOCKTON FACILITY <br /> FORMAL EXTERNAL TANK INSPECTION <br /> TANK:AST-7 <br /> Inspection Date: February 15, 2017 <br /> Photo 3: South, southeast side of AST-7 also showing interstitial area (secondary tank) leak <br /> detection pipe.. <br /> r. <br /> P <br /> _ - w <br /> Photo 4: West, southwest side of AST-7 shown with a Petrometer liquid level gauge and inline <br /> product distribution pump . <br /> l <br /> ow <br /> 014) CONDOR <br />