My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
166
>
2800 - Aboveground Petroleum Storage Program
>
PR0515523
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 11:09:52 AM
Creation date
10/11/2018 3:54:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515523
PE
2832
FACILITY_ID
FA0006289
FACILITY_NAME
VALLEY PACIFIC PETROLEUM SERVICES
STREET_NUMBER
166
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342003
CURRENT_STATUS
01
SITE_LOCATION
166 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item I Task Status Comments <br /> 3.0 Tank Equipment <br /> 3.1 Valves a. Check for leaks. EYes* ENO CN/A <br /> b. Tank drain valves EYes* ENO CN/A <br /> must be kept locked. <br /> 3.2 Spill a. Inspect for debris, I Yes* I No I N/A <br /> containment residue,and water in <br /> boxes on fill the box and remove. <br /> pipe b. Drain valves must EYes* ENO ❑N/A <br /> be operable and <br /> closed. <br /> 3.3 Liquid level a. Both visual and I Yes I No* ❑N/A <br /> equipment mechanical devices <br /> must be inspected <br /> for physical damage. <br /> b. Check that the []Yes []No* ❑N/A <br /> device is easily <br /> readable <br /> 3.4 Overfill a. If equipped with a I Yes I No* I N/A <br /> equipment "test"button, <br /> activate the audible <br /> horn or light to <br /> confirm operation. <br /> This could be battery <br /> powered. Replace <br /> the battery if needed <br /> b. If overfill valve is EYes ENO* ❑N/A <br /> equipped with a <br /> mechanical test <br /> mechanism, actuate <br /> the mechanism to <br /> confirm operation. <br /> 3.5 Piping Check for leaks, []Yes* []No <br /> connections corrosion and <br /> damage <br /> 4.0 Tank Attachments and Appurtenances <br /> 4.1 Ladder and Secure with no sign I IYes I INo* I IN/A <br /> platform of severe corrosion <br /> structure or damage? <br /> 5.0 Other Conditions <br /> 5.1 Are there other conditions that should []Yes* []No <br /> be addressed for continued safe <br /> operation or that may affect the site spill <br /> prevention Ian? <br /> AST INSPECTION STANDARD 5 SEPTEMBER 2011 <br /> COPYRIGHT©2011 Steel Tank Institute <br />
The URL can be used to link to this page
Your browser does not support the video tag.