Laserfiche WebLink
SANJ O 1` Q U I `IA,II, Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> OM SCOTT&SONS/HYPONEX CORP 23390 E FLOOD RD, LINDEN October 01, 2018 <br /> Other Violations <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> 4050 See below Unlisted Abandonment/Illegal Disposal/Unauthorized Treatment violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 105 CFR 112.1(b)(3), 112.2 Failure to properly close tanks when making a claim of permanently closed. <br /> The 1,000 gallon elevated tank which was used to store diesel at on point is not in use but has not been properly <br /> closed. When a tank is not in use, it must be permanently closed by meeting the following conditions: <br /> -remove all liquid and sludge from each container and connecting line <br /> -disconnect and blank off all connecting lines and piping have from the tank <br /> -close and lock all valves <br /> -post a sign conspicuously stating that it is a permanently closed container and denoting the date of closure. <br /> Immediately"Permanently Close"all tanks that are not being used or amend the Spill Prevention, Control, and <br /> Countermeasure Plan to include all petroleum tanks that have not been permanently closed. <br /> This is a minor violation. <br /> 203 CFR 112.3 Failure to implement the SPCC Plan. <br /> The SPCC plan calls for a sign notifying drivers that they are required to completely disconnect all fuel oil transfer <br /> lines prior to departing from the unloading area. Facility personnel stated that sign was not in place.The owner or <br /> operator or an onshore or offshore facility subject to this section must prepare in writing and implement a Spill <br /> Prevention Control and Countermeasure Plan (hereafter"SPCC Plan"or"Plan")," in accordance with§ 112.7 and <br /> any other applicable section of this part. Immediately implement the plan as written or amend the plan to reflect <br /> actual practices and procedures. <br /> This is a minor violation. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> The mobile refuelers are no longer parked in the location described in the SPCC plan. The Spill Prevention, <br /> Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility design, <br /> construction, operation, or maintenance that materially affects its potential for a discharge,within 6 months of the <br /> change, and implemented as soon as possible, not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> This is a minor violation. <br /> FA0005674 PR0537051 SCO01 10/01/2018 <br /> EHD 28-01 Rev.09/27/2018 Page 4 of 5 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />