My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
641
>
2300 - Underground Storage Tank Program
>
PR0231836
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2024 3:12:00 PM
Creation date
10/12/2018 11:32:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231836
PE
2381
FACILITY_ID
FA0002405
FACILITY_NAME
QUICK N SAVE MARKET AND GAS*
STREET_NUMBER
641
Direction
E
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14734106
CURRENT_STATUS
02
SITE_LOCATION
641 E CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ e <br /> STATE OF CALIFORNIA �� <br /> STATE WATER RESOURCES CONTROL BOARD i <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> y'f e <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. c""°""��- <br /> MARK ONLY ❑ EW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: J <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# D/ B. MANUFACTURED BY: (��Q,� <br /> C. DATE INSTALLED(MOIDAYA'EAR) 3/L D. TANK CAPACITY IN GALLONS: L� <br /> ILTANKC ENTS IFA-11SMARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B, C a REGULAR I� 3 DIESEL ❑ 6 AVIATIONGAS <br /> A. UNLEADED IL�J' <br /> E7] 2 PETROLEUM ❑ 80 EMPTY t PRODUCT ❑ lb PREMIUM 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 2 LEADED 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ UNLEADED ❑ 99 JOTHERL(DESCRIBE IN ITEM D. BELOW) <br /> ❑ <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.•: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,13.AND C.AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPEOF ❑ UBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM 2 INGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK Ele(l BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEELCUD Wl FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ S CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE WIFRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINEDKYO LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN 09 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO <br /> D.CORROSION ❑ 1 POLVETHVLENE WRAP ❑ ATINO F73 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION C LE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPL CABLE <br /> A. SYSTEM TYPE A U SUCT A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A USI A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U / A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL Wl COATING A U 6 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> NTM <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR [:] 2 LINE TIGHTNESS TESTING ❑ 3 MONRORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> A.TANK CLOSURE INFORMATIONANTT3 <br /> I.ESTIMATED DATE LAST USEDO/DAV/YR) 2. SUMMATED OREMAIINING TY OF (100L ALLONS 3 WASNERT MATERIALTANK FILLED I4 YES ❑ NO <br /> SUSSTANC <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# <br /> PERMITNUMBER PERMIT APPROVED BYIDATE PERMITEXPI TION DATE 313 6 1031 <br /> FORM 8 (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> ��F0ROm1161115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.