My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3003
>
2800 - Aboveground Petroleum Storage Program
>
PR0528317
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:57:45 PM
Creation date
10/15/2018 2:42:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528317
PE
2832
FACILITY_ID
FA0004400
FACILITY_NAME
STOCKTON STEEL CO
STREET_NUMBER
3003
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618002
CURRENT_STATUS
01
SITE_LOCATION
3003 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br /> Facility Stockton Steel Facility 3003 E Hammer Lane, Stockton Inspection Aug 7, 2013 <br /> Name: Address. Date: <br /> Facility Title: Phone <br /> Contact: Derric Juano Plant Superintendent 209-956-4751 <br /> Inspection <br /> Type: X Routine Follow up I i Complaint-ID#: i i Other. <br /> (Authority HSC 25270.4) <br /> Consentfor. Xlnspection Sampling XPhotos Granted by: Derric Juano Title: Plant Superintendent <br /> AST DSL USED OIL Hyd Oil MOTOR OI Total Facility Shell 11410 <br /> Content Capacity(gal): <br /> - Shell 10000- -- 110-•- - 1100-- ---200--- ------------ -•----- --------- -------- --------- SPCC Plan 5-year 2016 <br /> Capacity Review Date: <br /> SPCC Plan type: APSA SPCC conditionally exempt(HSC 25270.4.5(b)) X Fully or partially Professional Engineer certified Self-certified <br /> VIOLATIONS <br /> # C1 C2 M Code Section HSC=California Health and Safety Code;CFR=Code of Federal Regulations <br /> C1=Class 1 violation;C2=Class 2 violation,M=Minor violation <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br /> 102 HSC 25270.4.5(a) Failed to conduct periodic inspections of the storage tank to assure compliance with CFR Part 112 <br /> 103 HSC 25270.6(a) Failed to file business plan or annual tank facility statement if capacity>1 OK gallons and Z5% <br /> petroleum <br /> 104 HSC 25270.6(b) Failed to submit APSA fees <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons or more <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 X CFR 112.3(d) SPCC Plan certification by a Professional Engineer(PE)missing or incomplete <br /> 202 CFR 112.3(e) Failed to retain a copy of the SPCC Plan on site <br /> Amendment of SPCC Plan by owners or operators <br /> 301 CFR 112.5(a) Failed to amend SPCC Plan within 6 months,or implement changes within 6 months of amendment <br /> when there is an applicable change to the facility <br /> 302 CFR 112.5(b) Failed to amend SPCC Plan within 6 months,or implement changes within 6 months of amendment <br /> after scheduled 5 year Plan review <br /> 303 CFR 112.5(b) Failed to complete a review and evaluation of SPCC plan at least once every 5 years <br /> 304 ICFR 112.5(c) I Failed to have a PE certify technical amendments within 6 months of change <br /> Qualified Facilities Plan Requirements <br /> 401 CFR 112.6(a) Tier I qualified facility failed to self-certify(1)SPCC Plan;(2)technical amendment when there was an <br /> applicable change to the SPCC Plan <br /> 402 CFR 112.6(a)(3) Tier I qualified facility SPCC Plan incomplete <br /> 403 CFR 112.6(b) Tier II qualified facility failed to self-certify(1)SPCC Plan;(2)technical amendment when there was an <br /> applicable change to the SPCC Plan <br /> 404 CFR 112.6(b)(4) Failed to provide written PE certification in a self-certified plan for alternate methods which provide <br /> environmental equivalence,or provisions in lieu of secondary containment due to impracticality <br /> General Requirements for SPCC Plans <br /> 501 CFR 112.7 Failed to include a cross-referencing section for a Plan that does not follow the sequence specified in this <br /> section <br /> 502 CFR 112.7 SPCC Plan lacks full approval of management at a level of authority to commit the necessary resource <br /> to implement the Plan <br /> 503 CFR 112.7(a)(2) Failed to provide equivalent environmental protection and/or state the reasons for nonconformance and <br /> describe the alternate methods and how they achieve equivalent environmental protection <br /> 504 X CFR 112.7(a)(3) No facility diagram or diagram failed to show location and contents of each container,transfer stations, <br /> and connecting pipes. <br /> 505 X CFR 112.7(a)(3)(i) SPCC Plan failed to include description of product type and storage capacity for each container <br /> 506 CFR 112.7(a)(3)(ii) SPCC Plan failed to include procedures for routine handling of products and discharge prevention <br /> measures <br /> 507 CFR 112.7(a)(3)(iii) SPCC Plan failed to show discharge or drainage controls(secondary containment),equipment,and <br /> procedures for the control of a discharge <br /> 508 CFR 112.7(a)(3)(iv) SPCC Plan failed to show countermeasures for discovery,response and cleanup of discharges <br /> Inspector. Title: <br /> Garrett Backus (209) 468-2986 � T 'sjJ —_1!:0 0��*" <br /> EHD 28-02 Rev 08/19/12 Page 1 APSA I SPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.