Laserfiche WebLink
Spill Prevention Control and Countermeasure <br /> Compliance Inspection Plan <br /> Review Page <br /> In accordance with 40 CFR 11.2.5(b),a review and evaluation of this SPCC plan is conducted every <br /> five vears. As a result of this review and evaluation,Valley Pacific Petroleum Services,Inc.will <br /> amend this plan within 6 months of the review to include more effective spill prevention and <br /> control technology if such technology will significantly reduce the likelihood of spills at the facility <br /> and the technology is cost effective and field proven at the time of the review. Any amendment of <br /> the SPCC Plan will be certified by a professional engineer within 6 months of any change in the <br /> facility design,construction operation,or maintenance which occurs which materially affects the <br /> facility's potential for the discharge of oil' or upon the navigable waters of the United States. <br /> i <br /> Required Required <br /> tit <br /> Review Date / re Change" Certification <br /> 1. January 2000 // ❑ ❑ <br /> 2. November 1,20107 ❑ ❑ <br /> 3. January 14,2011 A F-9 <br /> 4. June 28.2012 ❑ ❑ <br /> 5. ❑ ❑ <br /> 6. ❑ ❑ <br /> 7. ❑ ❑ <br /> 8. _ _ _ ❑ ❑ <br /> 9. _ -- ❑ ❑ <br /> Management Approval = See attached <br /> Valley Pacific Petroleum Services,Inc.is committed to the prevention of discharges of oil to navigable <br /> waters of the United States and the environment,and maintains the highest standards for spill prevention <br /> control and countermeasures through regular review,updating,and implementation of the SPCC Pian for <br /> this Ficillty. <br /> Authorized Representative: Mike Eliason Signature_ '_' i _ <br /> Representative's Title: Cardlock Manager <br /> SPCC Coordinator <br />