Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> California Materials, INC 3736 S Highway 99 , Stockton October 23, 2014 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act(APSA) regulated shell capacity of 10,605 gallons. A Spill <br /> Prevention, Control, and Countermeasure (SPCC) Plan was not available on site. All facilities which have an APSA <br /> regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112, which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer (PE) <br /> certified SPCC Plan to the EHD for review. (This copy will be returned to the facility after review.) A copy shall be <br /> maintained on site at all times. This is a Class II violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by November 22, 2014. <br /> Consent to perform the inspection, take photos and collect samples was given by Tony Garrett, service manager. <br /> Please be aware as of January 1, 2013, all businesses are required to submit all new (or any changes to existing) <br /> Aboveground Petroleum Storage Act (APSA) information online to the California Environmental Reporting System <br /> (CERS) at http-.//cers.calepa.ca.gov in addition to any other relevant activities and required fields. No later than <br /> January 1, 2014, all APSA data must be entered and or updated in CERS. <br /> Provided: Return to Compliance Certification form, Schedule of free CUPA classes <br /> ece y(initial): Inspector: hone: ate: <br /> STACY RIVERA, Senior REHS (209) 468-3440 10/23/2014 <br /> Pana 3 of d <br />