My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3516
>
2800 - Aboveground Petroleum Storage Program
>
PR0524172
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2018 4:27:57 PM
Creation date
10/16/2018 10:16:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0524172
PE
2832
FACILITY_ID
FA0014266
FACILITY_NAME
BOBCAT CENTRAL INC
STREET_NUMBER
3516
Direction
N
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
13206005
CURRENT_STATUS
01
SITE_LOCATION
3516 N NEWTON RD
P_LOCATION
99
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> The operator of this facility certifies that each of the following is true in order to comply with the SPCC requirements: <br /> I Rick Fitzsimmons certify that the following is accurate: <br /> 1. 1 am familiar with the applicable requirements of 40 CFR part 112; <br /> 2. 1 have visited and examined the facility; <br /> 3. This Plan was prepared in accordance with accepted and sound industry practices and standards; <br /> 4. Procedures for required inspections and testing have been established in accordance with industry inspection <br /> and testing standards or recommended practices; <br /> 5. 1 will fully implement the Plan; <br /> 6. This facility meets the following qualification criteria (under§112.3(g)(1)): <br /> a. The aggregate aboveground oil storage capacity of the facility is 10,000 U.S. gallons or less; and <br /> b. The facility has had no single discharge as described in §112.1(b) exceeding 1,000 U.S. gallons and no <br /> two discharges as described in §112.1(b) each exceeding 42 U.S. gallons within any twelve month period <br /> in the three years prior to the SPCC Plan certification date, or since becoming subject to 40 CFR part 112 <br /> if the facility has been in operation for less than three years (not including oil discharges as described in <br /> §112.1(b)that are the result of natural disasters, acts of war, or terrorism); and <br /> c. There is no individual oil storage container at the facility with an aboveground capacity greater than 5,000 <br /> U.S. gallons. <br /> 7. This Plan does not deviate from any requirement of 40 CFR part 112 as allowed by §112.7(a)(2) (environmental <br /> equivalence) and §112.7(d) (impracticability of secondary containment) or include any measures pursuant to <br /> §112.9(c)(6) for produced water containers and any associated piping; <br /> 8. This Plan and individual(s) responsible for implementing this Plan have the full approval of management and I <br /> have committed the necessary resources to fully implement this Plan.I also understand my other obligations <br /> relating to the storage of oil at this facility, including, among others: <br /> I also understand my other obligations relating to the storage of oil at this facility, including, among others: <br /> 1. To report any oil discharge to navigable waters or adjoining shorelines to the appropriate authorities. Notification <br /> information is included in this Plan. <br /> 2. To review and amend this Plan whenever there is a material change at the facility that affects the potential for an <br /> oil discharge, and at least once every five years. Reviews and amendments are recorded in an attached log [See <br /> Five Year Review Log and Technical Amendment Log in Attachments 1.1 and 1.2.] <br /> 3. Optional use of a contingency plan. A contingency plan: <br /> a. May be used in lieu of secondary containment for qualified oil-filled operational equipment, in accordance <br /> with the requirements under§112.7(k), and; <br /> b. Must be prepared for flowlines and/or intra-facility gathering lines which do not have secondary <br /> containment at an oil production facility, and; <br /> c. Must include an established and documented inspection or monitoring program; must follow the provisions <br /> of 40 CFR part 109; and must include a written commitment of manpower, equipment and materials to <br /> expeditiously remove any quantity of oil discharged that may be harmful. If applicable, a copy of the <br /> contingency plan and any additional documentation will be attached to this Plan as Attachment 2. <br /> 1 certify that I have satisfied the requirement to prepare and implement a Plan under§112.3. 1 certify that the information <br /> contained in this Plan is true. <br /> (�_eSignature Title: Director of Parts and Service <br /> Name Rick Fitzsimmons Date: ` 1211 a <br /> Facility Name: Bobcat Central, Stockton 2 Tier 1 Qualified Facility SPCC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.