Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax:(209)468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> C DEJONG TRUCKING INC 24975 S AUSTIN RD, RIPON February 17, 2017 <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements including a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable ❑V ❑R ❑COS <br /> 603 CFR 112.7(a)(3) Failed to adequately describe the physical layout of the facility in the Plan ❑V ❑R ❑COS <br /> 604 CFR 112.7(a)(3)(i) Plan failed to include oil type and storage capacity for each container ❑V ❑R ❑COS <br /> 605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures, including routine handling ❑V ❑R ❑COS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls ❑V ❑R ❑COS <br /> 607 CFR 112.7(a)(3)(iv) Plan failed to include countermeasures for discharge discovery, response and cleanup ❑V ❑R ❑COS <br /> 608 CFR 112.7(a)(3)(v) Plan failed to address disposal methods for recovered materials ❑V ❑R ❑COS <br /> 609 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge ❑V ❑R ❑COS <br /> 112.7(a4) <br /> 610 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ❑V ❑R ❑COS <br /> 611 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V ❑R ❑COS <br /> 612 CFR 112.7(c) Plan failed to include secondary containment,diversionary structures,or equip to prevent discharge ❑V ❑R ❑COS <br /> 613 CFR 112.7(c) Failure to provide appropriate secondary containment,diversionary structures or equipment ❑V ❑R ❑COS <br /> 614 CFR 112.7(d) PE certified Plan failed to explain impracticability of containment/diversionary structures ❑V ❑R ❑COS <br /> 615 CFR 112.7(d) Failure to perform integrity and leak testing when claiming secondary containment impracticability ❑V ❑R ❑COS <br /> 616 CFR 112.7(d)(1) Failure to prepare an oil spill contingency plan when claiming impracticability of structures ❑V ❑R ❑COS <br /> 617 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> 618 CFR 112.7(e), 112.8(c) Failed to conduct inspections or integrity tests or maintain records for 3 years ❑V ❑R ❑COS <br /> (6) <br /> 619 CFR 112.7(f)(1) Failed to train personnel on discharge prevention ❑V ❑R ❑COS <br /> 620 CFR 112.7(f)(2) Failed to designate a person accountable for discharge prevention ❑V ❑R ❑COS <br /> 621 CFR 112.7(f)(3) Failed to schedule and conduct discharge prevention briefings at least annually ❑V ❑R ❑COS <br /> 622 CFR 112.7(f)(3) Failure to conduct spill prevention briefing for oil-handling personnel ❑V ❑R ❑COS <br /> 623 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 624 CFR 112.7(g) Facility failed to implement security of site and valves,lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 625 CFR 112.7(h) Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack ❑V ❑R ❑COS <br /> 626 CFR 112.7(h)(1) Loading/unloading rack containment system not adequate to contain spill ❑V ❑R ❑COS <br /> 627 CFR 112.7(h)(2) Failed to provide vehicular departure system for loading and unloading racks ❑V ❑R ❑COS <br /> 628 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles ❑V ❑R ❑COS <br /> 629 CFR 112.7(i) Failed to evaluate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 630 CFR 112.7(k) Failure to provide general secondary containment or alternative for oil-filled operational equipment ❑V ❑R ❑COS <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 701 CFR 112.8(b)(1) Failure to ensure drainage from diked areas is restrained by valves or alternative method ❑V ❑R ❑COS <br /> 702 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas ❑V ❑R ❑COS <br /> 703 CFR 112.8(b)(3), Failed to design facility drainage system from undiked areas to retain in the facility ❑V ❑R ❑COS <br /> 112.8(b)(4) <br /> FA0009333 PR0528645 SC001 02/17/2017 <br /> EHD 28-01 Rev.09/22/16 Page 2 of 4 Aboveground Petroleum Storage Act OIR <br />