Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> California Health Care Facility 1(209)467-2500 September 04, 2014 <br /> Facility Address: EPA ID. CERS ID: <br /> 7707 Austin Rd, Stockton, CA 95215 1 10460950 <br /> Facility Contact: Contact Phone: Contact during inspection,if <br /> Steven Sasson (209)467-7904 different from facility contact: <br /> Inspection type: Program: <br /> ROUTINE INSPECTION -Operating Permit 12832-ASTFAC 10 K-</=100 K GAL CUMULATIVE <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Code of Federal Regulations <br /> V=Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 =V R L COS <br /> 102 HSC 25270.4.5(a) Failed to properly close a tank that is considered permanently closed V R c COS <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement if capacity is over 10,000 gallons V :R ❑COS <br /> 104 HSC 25270.6(b) Failed to submit APSA fees u V :,R n COS <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more _;V .j R a COS <br /> 106 Failed to submit a written response within 30 days of receiving an inspection report T V c R -j COS <br /> 107 HSC 25404(e)(4) Failed to report program data electronically V 71 R Li COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> A CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete ■V R _COS <br /> 202 CFR 112.3(e)(1) Failed to maintain a copy of the Plan on site V iR COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary ❑V -i R -i COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments V -R _COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments V i R ,COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section V -R COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan ■V R COS <br /> 603 CFR 112.7(,)(2) Plan failed to discuss equivalent environmental protection,if applicable V -R COS <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers,transfer stations,and pipes ■V _,R -COS <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout,operations discharge prevention method d containers V -i R COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge V - R COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan ) "' o COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalen a COS <br /> 609 CFR 112.7(c) Failed to provide secondary containment,diversionary structures,or eqi ment to preven d' c1 r ■V -,R COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability ROw ❑V -,R COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response _ !or64/11-HPV R COS <br /> 612 CFR 112.7(d)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge` _ R COS <br /> 13 CFR 112.7(e) Failed to conduct inspections or maintain records for 3 years ■V ;R COS <br /> Received by(initial): Inspector: Phone: Date: <br /> ELENA MANZO, REHS (209)953-7699 09/04/2014 <br /> Page 1 of 5 <br />