My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
500
>
2800 - Aboveground Petroleum Storage Program
>
PR0516579
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2018 1:18:44 AM
Creation date
10/18/2018 11:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516579
PE
2832
FACILITY_ID
FA0009875
FACILITY_NAME
FORD CONST CO INC
STREET_NUMBER
500
Direction
N
STREET_NAME
CLUFF
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04934013
CURRENT_STATUS
01
SITE_LOCATION
500 N CLUFF AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.smgov.org/ehd/unitiii.htmi <br /> CONTINUATION FORM Page: 5 of 5 <br /> OFFICIAL INSPECTION REPORT Date: 03/23/12 <br /> Facility Address: Ford Construction Company Inc 500 N. Cluff Ave. Lodi CA 95240 Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I, CLASS II,or MINOR-Notice to Comply) <br /> 517. Page 8 section 7.2 of the facility SPCC Plan lists tests and inspections that must be conducted. <br /> Documentation of tests conducted and test results were not found on site. Inspections and tests must be <br /> conducted in accordance with the written procedures developed in the SPCC Plan. Records of these <br /> inspections and tests must be signed by the appropriate supervisor or inspector and kept on site with the <br /> SPCC Plan for a period of three years. Correct immediately by implementing this practice. <br /> 609. Page 8 section 7.2 of the facility SPCC Plan lists tests and inspections that must be conducted. <br /> Documentation of tests conducted and test results were not found on site. Integrity testing has not been <br /> conducted on the aboveground petroleum tanks per the facility SPCC Plan. The facility shall test or <br /> inspect each aboveground container for integrity on a regular schedule and whenever you make material <br /> repairs. Examples of these integrity tests include, but are not limited to: visual inspection, hydrostatic <br /> testing, radiographic testing, ultrasonic testing, acoustic emissions testing, or other systems of non- <br /> destructive testing. Comparison records and other records of inspections and tests must be maintained <br /> on site with the SPCC Plan. Immediately conduct all necessary integrity testing and maintain records on <br /> site as required. <br /> Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br /> each violation was corrected, including supporting documentation to the EHD. <br /> This completed report on 3-26-12 supersedes the original inspection checklist left on site with operator <br /> on 3-23-12. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Received By: Title: <br /> Aris Cacapit (209) 468-3453 i <br /> EHD 23-02-003 Rev 07/12/11 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.