Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:www.siQov.orq/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> 17333 S COMCONEX RD, MANTECA ��ii ust 21. 2015 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 723 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping ❑V ❑ R ❑COS <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations ❑V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑ R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑ R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112. <br /> This facility has an Aboveground Petroleum Storage Act (APSA) regulated shell capacity of 10,000 gallons. A Spill <br /> Prevention, Control, and Countermeasure (SPCC) Plan was not available on site. All facilities which have an APSA <br /> regulated shell capacity of 1,320 gallons or greater shall prepare a written SPCC Plan which meets all of the <br /> requirements of the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 <br /> CFR 112.3(d). Immediately prepare a SPCC Plan in accordance with 40 CFR Part 112, which that includes all <br /> aboveground petroleum storage containers 55 gallons or larger. Submit a copy of the Professional Engineer (PE) <br /> certified SPCC Plan to the EHD for review or properly permanently close the tank(s). A copy shall be maintained on <br /> site at all times. <br /> This is a Class II violation. <br /> 102 HSC 25270.4.5(a) Failed to properly close a tank that is considered permanently closed. <br /> The two above ground tanks (10,000 gallon diesel and 400 gallon waste oil) are not in use but has not been properly <br /> closed. When a tank is not in use, it must be permanently closed by meeting the following conditions: <br /> - remove all liquid and sludge from each container and connecting line <br /> - disconnect and blank off all connecting lines and piping have from the tank <br /> - close and lock all valves <br /> - post a sign conspicuously stating that it is a permanently closed container and denoting the date of closure. <br /> Immediately"Permanently Close" all tanks that are not being used or amend the Spill Prevention, Control, and <br /> Countermeasure Plan to include all petroleum tanks that have not been permanently closed. <br /> This is a Class II violation. <br /> Received by Inspector: Phone: Date: <br /> (initial): ELENA MANZO, Senior REHS (209) 953-7699 08/21/2015 <br /> Page <br />