Laserfiche WebLink
Completed <br />Date: < — <br />MONTHLY INSPECTION CHECKLIST <br />Cherokee Freight Lines <br />Item To Check <br />Tank 1 - Used <br />Motor Oil <br />Tank 2 - New <br />Motor Oil <br />Tank 3 - New <br />Motor Oil <br />Tank 4- New <br />Motor Oil <br />Refer to Attachment II of the Inspection Procedures, located in Appendix D of the SPCC Plan, for detailed information on how to check for water. � O <br />D <br />Water Present in Tank?* <br />Water/Oil Present in Secondary Containment <br />Structures? <br />r <br />� <br />D <br />N <br />r <br />_.t <br />�r <br />M <br />Pipe Connections Leaking? <br />Check Gaskets in Flanged Connections. <br />(Replace as Necessary) <br />Q <br />N <br />f <br />Threaded Connections Tight and Secure? <br />Double Walled Tanks Only <br />Product Present in Interstice? Or Leak Detection <br />System Operable? <br />5 <br />7F 5 <br />Drums 1-6 New <br />Motor Oil <br />Drums 10-16 <br />New Motor Oil <br />Drum 17 - <br />Diesel Fuel <br />Evidence of Drum Damage or Deterioration? <br />VVater/Uil Presentin Secondary Containment <br />Structures? <br />J'J <br />Comm entS/RPrnm MT nH.ti-- <br />rn <br />Refer to Attachment II of the Inspection Procedures, located in Appendix D of the SPCC Plan, for detailed information on how to check for water. � O <br />D <br />rn <br />Z <br />� <br />D <br />N <br />r <br />_.t <br />�r <br />M <br />