Laserfiche WebLink
Corrective Action Measures <br /> Corrective Action Measures per Routine hazardous Waste inspection on 9/02/10 by <br /> Thuy Tran. <br /> #9. 1 am currently working with our environmental manager to have a.PE revise the <br /> SPCC plan to exclude the 1000 gallon gasoline tank. All chaaiges should be completed <br /> with in a. year. <br /> 24#. 1 am currently working with our environmental manager to ha a PE revise the SPCC <br /> plan to include all agencies that would be contacted in the event of a Hazardous Materials <br /> spill. All chances should be completed with in a year. <br /> #52. We promptly corrected the dried cakey oil problem residues in tie secondary <br /> containment area. All material was manifested and disposed of by Evergreen. <br />