My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
400
>
2800 - Aboveground Petroleum Storage Program
>
PR0522005
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 11:46:08 AM
Creation date
10/19/2018 9:59:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0522005
PE
2832
FACILITY_ID
FA0010965
FACILITY_NAME
KNIFE RIVER
STREET_NUMBER
400
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14712001
CURRENT_STATUS
01
SITE_LOCATION
400 S LINCOLN ST
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> AUG 14 2018 <br /> ENVIRONMENTAL <br /> Name and Address of Owner: HEALTH I)FRgRTMENT <br /> Concrete Inc. DBA Knife River Northern <br /> California Ready Mix <br /> 400 S. Lincoln St. <br /> Stockton, Ca . 95203 <br /> Designated Person(s) accountable for oil spill prevention at facility: <br /> David Smith, General Manager- (209) 946-7882 <br /> Knife River-Northern California Ready Mix division Cell (209) 639-3515 <br /> Michael Brentt, Quality Control/Quality Assurance (209) 946-7877 <br /> Cell (209) 639-5513 <br /> Steve Azevedo, Regional Environmental Manager (209) 932-2128 <br /> Knife River Corp. General Administration-Pacific Cell (209) 993-9354 <br /> 3.0 Schedule for Implementation — 40 CFR 112.3(a) <br /> The following spill prevention-related equipment and procedures are scheduled installed or <br /> implemented at the KRC Stockton Ready Mix Plant. <br /> • Routine monthly visual examination of all onsite oil product storage tanks. Since the tanks are <br /> visible from all sides, a monthly visual inspection provides a practical alternative to periodic <br /> integrity testing, while still providing equivalent environmental protection. A monthly visual <br /> inspection on all sides will be performed in lieu 112.8(c)(6). <br /> • Inspect secondary containment interior, record findings and seal outlets. <br />
The URL can be used to link to this page
Your browser does not support the video tag.