Laserfiche WebLink
F EM <br />Monitoring System Certification <br />Monitoring System Certification UST Monitoring Site Plan <br />Site Address: LOVES 1553 COLONY ROAD RIPON CA 95366 <br />AUG 17 2017 <br />f� L <br />KEY x 27S. . . . . . . . . . . . . . . . . "^P�? <br />A = ANNULAR . . . . . 27 . . . . . . . . . . . . . . . . . . . . . <br />F = FILLS x 26S . . . . . . . . . . . . . . . <br />T = TURBINE 26. . . . . . . . . . . . . . . . . . . . . . . . . . . <br />P = PROBEx 25S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />V= VAPOR F . 25 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />X = SUMP SENSOR x 24S . . . . . . . . . . . . . . <br />L = Leak Detector . . . . . 24 <br />M = Manway. <br />OD� <br />. . . . <br />F <br />x <br />P <br />23S. . . . . . . . . . . . <br />B = Brine Sensor <br />. <br />. . . <br />23 . . . . . . . . . . . . . . . . <br />I = Smart Sensor <br />. <br />. _ . . <br />T1 <br />X <br />22s. <br />5 = STP <br />. . <br />. . . <br />.22 . . . . . . . . . . . . . . . <br />C = Floats & Chains <br />x <br />T1. <br />E = E Stop <br />=.21S <br />. . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . <br />. . . . <br />. . . . . <br />. 21 . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . <br />. <br />DIE <br />X O <br />OD� <br />C88 <br />F <br />x <br />P <br />X <br />O <br />O <br />87 V <br />V <br />X F <br />F <br />91 <br />V <br />T1 <br />X <br />ll <br />S <br />;TL <br />x <br />P <br />x <br />T1. <br />. . . . . . .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . 14. 13. .10.. 9. . . . . 6. nn 5. 2. 1. . . . . . . . . . <br />x. . . . . . . �. . . . . . . ..4-.-J . . . . . . . . x . . . . . . . . . . . . <br />16 . . . <br />15. .12. 11 ..B....7 . . . . . 4. x .3 . . . . . . . . . . . . . . . . <br />. .�, . . . . . . . . . . . . . . <br />18. \ . 17. 20 F <br />.19. . . . . . . . . . <br />. <br />Date map was drawn: 8-8-17 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />H <br />