Laserfiche WebLink
Monitoring System Certification <br />Monitoring System Certification UST Monitoring Site Plan <br />Site Address: LOVES 1553 COLONY ROAD RIPON CA 95366 <br />KEY' . . . . 27S. <br />=ANNULAR ..... 27 .................................... <br />X 2ss.. <br />=FILLS <br />= TURBINE . . . . . 2s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />= PROBE . . . . . X 25S. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />=VAPOR ..... 25 ............................................ <br />= SUMP SENSOR X 24S . . . . . . . . . . . . . . . <br />= Leak Detector <br />. <br />. . . . <br />F <br />P X <br />24 . . . . . . . . . . . . . . . . <br />= Manway <br />. <br />. . . . <br />23S . . . . . . . . . . . . . . <br />= Brine Sensor <br />X <br />23. <br />= Smart Sensor <br />TL <br />X <br />X <br />P <br />22S. <br />= STP <br />X <br />Tt. <br />. . . . . <br />= Floats & Chains <br />. . . <br />. 22 . . . . . . . . . . . . . . . . <br />= E Stop <br />. . . . <br />. 21S . . . . . . . . . . . . . . . . <br />. . . . . . . . <br />. . . . . . . . <br />21. . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . <br />. . . . . . . . . . . . . <br />DIE <br />X O <br />ODIE <br />870 <br />X <br />O <br />F <br />P X <br />X <br />0 <br />X <br />O <br />1 PI <br />lJ <br />87V <br />XO <br />91 <br />vV <br />TL <br />X <br />TI, X <br />TL <br />X <br />X <br />P <br />X <br />Tt. <br />Date map was drawn: 8-8-17 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas, mechanical or electronic line leak detectors, and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />