My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:27:51 PM
Creation date
10/19/2018 10:08:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
663
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE COPY <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YFS [I NO [ I <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review).- <br />Removal <br />eview): <br />Removal of 10 existing Environ sump and replace with new Bravo B-8000 dispenser sump. Currently the site has only 2 diesel filling locations. <br />During construction will will be added diesel to all filling locations. <br />During construction vin will be removing a portion of pipe for removing the existing UDC's. Existing pipe to be reconnected to and extend to all <br />other tilling locations. <br />Installation of (1) new Bravo B-834 single wall transition sump located on Northeast side of existing canopy. New Bravo <br />new Bravo transition sump to be equipped with new Veeder-Root 208 sump sensor. <br />-- - >2�iARQNi44L NATAL HEALTH <br />DEPARTMENT <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />Bravo B-8000 Single Wall deep under dispenser containment <br />Smith Piping Red Thread IIA <br />Bravo F -32 -TS -MP penetrations / Fitting for 3" over 2" FRP pipe w/ dual lest port <br />r)PW - shear Valves 1OBHMP-5830 <br />Franklin Fueling Flexes - FFUL15X18HMXHM 1 1/2" dia flex w/ 1 1/2" hex male by 11/2" hex male 18" <br />Bravo B-834 Commercial Sinole Wall Transition <br />Veeder-Root 794380-208 piping sump sensor <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.