Laserfiche WebLink
Continued from Page 1 ° <br />The B830 series secondary containment sumps are each constructed to contain a set maximum <br />liquid volume. No method exists for the manufacturer to verify that the sump size selected by the <br />contractor / engineer is sufficient to contain the annulus of the primary piping per the requirements <br />listed at California Code of Regulations (CCR) Title 23, Division 3, Chapter 16, Article 3, <br />Section 2631(d)(1). The readers are guided in each respective installation manual to observe this <br />requirement and web links are provided to help guide them to the standard. <br />Upon review of the manufacturing procedures, the employment of the materials used in the <br />Bravo Systems B830 series SingleWall and DoubleWall transition containment sumps and the <br />manufacturer's installation manual for its parent product line containing specific and well -detailed <br />illustrations and guidelines, it is my opinion and conclusion that sound design and engineering of <br />this product provides exceptional secondary containment of all motor vehicle fuels or alternative <br />fuels and their additives currently produced and stored. <br />Please contact me with any questions at 323-888-4136 <br />Since ly, 4K <br />Don K. Mukai, P.E. <br />Mechanical Engineer <br />JLii_# 2017 <br />QPp'r" cSSlp <br />K. if F <br />O <br />No. 3 T_ � <br />s� AN�G <br />�oF CAl-IF° <br />3RP-B830-Commercial-Series PAGE 2 of 2 <br />