Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NOX, <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />REPAIRS PER ANNUAL MONITOR CERTIFICATION FINDINGS 8/12/2014: <br />Replace Diesel Fill Bucket (Nearest Store) <br />Install 2 VMI 99-LD3000 MLLD's at both Diesel STP's (Replaces FePetro MLLD's) <br />Replace 208 sensor at L40 under #15/16 (intermittent sensor out) <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />•' 11-DEVR Product Fill SpillContainer <br />2 each: VMI 99 LD -300(2 Leak Detrctor, VMI 99-LD3000, High Capacity <br />1 each: VR 794380-208 Sensor, Sump, Non -Discriminating <br />