Laserfiche WebLink
Monitoring System Certification RECEIVED <br />Monitoring System Certification UST Monitoring Site Plan <br />Site Address: LOVES 1663 COLONY ROAD RIPON CA 96366 A U G 2 8 2014 <br />. . . . . . . . . . . . . . . . . . x <br />27S. . . <br />. . . . . . . . . . . . . . . . . . . . <br />. . . . . . MENIAL HEA <br />................. <br />. . . . . . . . . . . . . . . x <br />. 27...... <br />26S. <br />A=ANNULAR <br />................ <br />DEPARTMENT'.'. <br />. . . . . . . . . . . . . . . . . <br />26. <br />0V91 <br />X <br />P <br />F=FILL <br />. . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . 0 <br />226. . <br />. . . <br />V=VAPOR <br />P=PROBE T=TURBINE <br />. . . . . . . . <br />. . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . <br />24S. . . <br />. . . <br />X=SENSOR <br />24 <br />DIE <br />X O <br />DIE <br />X O <br />C8O <br />F <br />px <br />3 g'0 V <br />XF <br />T <br />X <br />�X <br />X ❑ <br />0V91 <br />X <br />P <br />x <br />T <br />Date map was drawn: 8/11/11 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />rH <br />