My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
304
>
3500 - Local Oversight Program
>
PR0543359
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 10:31:39 AM
Creation date
10/22/2018 9:47:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543359
PE
3528
FACILITY_ID
FA0000733
FACILITY_NAME
RIPON USD-MAIN KITCHEN
STREET_NUMBER
304
Direction
N
STREET_NAME
ACACIA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904005
CURRENT_STATUS
02
SITE_LOCATION
304 N ACACIA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> Mr. Zuber -2- September 30,2002 <br /> All costs for corrective action must meet the requirements ofArticle Il, Chapter lb, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement. <br /> i • The Fund will review any tasks/costs that go beyond the pie-approved amount to be <br /> determined if the additional tasks and costs are necessary 'and reasonable. However, if costs <br /> exceed the above pre-approved amounts,the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> 0 --The work products-must be_acceptable�to.the County.-__ <br /> --_ _ <br /> • If a different scope of work becomes necessary,then you must request pre=approval of costs <br /> on the new scope of work. P <br /> • Although I have referred to the ATC proposal in my pre-approval above,please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. " <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services,don't hesitate to <br /> call me. <br /> h <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval.before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis,that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> -=--~ -invoices are subbzitted you inust`include copiesof all:`" `�.; " = -' '""4` <br /> • subcontractor invoices, <br /> { • technical reports, when available, and <br /> • applicable correspondence from the regulatory agency. <br /> j <br /> l <br /> I <br /> j <br /> California Environmental Protection Agency <br />
The URL can be used to link to this page
Your browser does not support the video tag.