My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
304
>
3500 - Local Oversight Program
>
PR0543359
>
ARCHIVED REPORTS XR0000013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 11:04:17 AM
Creation date
10/22/2018 9:59:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000013
FileName_PostFix
XR0000013
RECORD_ID
PR0543359
PE
3528
FACILITY_ID
FA0000733
FACILITY_NAME
RIPON USD-MAIN KITCHEN
STREET_NUMBER
304
Direction
N
STREET_NAME
ACACIA
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25904005
CURRENT_STATUS
02
SITE_LOCATION
304 N ACACIA AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL <br />0 <br />0 A S S O C I A T E S I N C <br />for TPHg, TPHd, BTEX, and oxygenate fuel additives Purge water will be stored in 55 -gallon <br />drums approved for hazardous liquid storage pending laboratory analysis <br />Report Preparation <br />Upon completion of the well installation and development activities, a summary report will be <br />prepared for submittal to PHS/EHD The report will include a description of all field activities, <br />laboratory analytical results, and welVbonng logs <br />All work described in this workplan will be performed under the direction of a California <br />Registered Professional Engineer All work will be performed in accordance with ATC's Site <br />Safety Plan (SSP) contained in Attachment 1 and Quality Control/Quality Assurance Plan on file <br />with PHS/EHD <br />Projected Schedule <br />Once approval of this workplan has been received, ATC will schedule drilling activities ATC will <br />notify PHS/EHD at least 48 hours prior to beginning any field activities The summary report will <br />be submitted to PHS/EHD approximately four to five weeks after the completion of field <br />activities <br />If you have any questions or require additional information regarding this workplan, please <br />contact us at (209) 579-2221 <br />Respectfully submitted, <br />ATC Associates Inc <br />A& -,,J <br />�L A --a, <br />Drew Van Allen <br />Staff Scientist <br />Jeanne Homsey, P E <br />Registered Engineer No C47410 <br />Attachments <br />cc Mr Leo Zuber - Ripon Unified School District <br />0 <br />w 114981 NrepomW&pwel dw 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.