Laserfiche WebLink
CL <br />0 <br />0 A S S O C I A T E S I N C <br />for TPHg, TPHd, BTEX, and oxygenate fuel additives Purge water will be stored in 55 -gallon <br />drums approved for hazardous liquid storage pending laboratory analysis <br />Report Preparation <br />Upon completion of the well installation and development activities, a summary report will be <br />prepared for submittal to PHS/EHD The report will include a description of all field activities, <br />laboratory analytical results, and welVbonng logs <br />All work described in this workplan will be performed under the direction of a California <br />Registered Professional Engineer All work will be performed in accordance with ATC's Site <br />Safety Plan (SSP) contained in Attachment 1 and Quality Control/Quality Assurance Plan on file <br />with PHS/EHD <br />Projected Schedule <br />Once approval of this workplan has been received, ATC will schedule drilling activities ATC will <br />notify PHS/EHD at least 48 hours prior to beginning any field activities The summary report will <br />be submitted to PHS/EHD approximately four to five weeks after the completion of field <br />activities <br />If you have any questions or require additional information regarding this workplan, please <br />contact us at (209) 579-2221 <br />Respectfully submitted, <br />ATC Associates Inc <br />A& -,,J <br />�L A --a, <br />Drew Van Allen <br />Staff Scientist <br />Jeanne Homsey, P E <br />Registered Engineer No C47410 <br />Attachments <br />cc Mr Leo Zuber - Ripon Unified School District <br />0 <br />w 114981 NrepomW&pwel dw 4 <br />