My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2449
>
3500 - Local Oversight Program
>
PR0543839
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 11:57:01 AM
Creation date
10/22/2018 10:30:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543839
PE
3528
FACILITY_ID
FA0003760
FACILITY_NAME
SUNWEST LIQUORS
STREET_NUMBER
2449
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
02741005
CURRENT_STATUS
02
SITE_LOCATION
2449 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ' r) 1 <br /> Ms. Maragos -2- November 14, 2003 <br /> were in fact necessary, the Fund will reimburse at reaso lable rates (rates consistent with those <br /> pre-approved). <br /> In order for future costs for corrective action to b part of the expedited reimbursement <br /> process, they must be pre-approved in writing by Fund staff. <br /> All costs for corrective action must meet the req irements of Article 11, Chapter 16, <br /> Underground Storage Tank Regulations in order to be eligible for reimbursement. <br /> • The Fund will review any tasks/costs that go beyond the pre-approved amount to be <br /> determined if the additional tasks and costs are nec ssary and reasonable. However, if costs <br /> exceed the above pre-approved amounts, the Fund will be unable to expedite your <br /> Reimbursement Request. <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Foothill Engineering proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> w xPlease remember that it is still necessary to submit the ctual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insurie that your consultant prepares their <br /> invoices to include the required breakdown of costs oi z a time and materials basis, that <br /> invoiced tasks are consistent with the original propos 1, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports,. when available, and <br /> • applicable correspondence from the County. <br /> California En vironmental P otection Agency <br /> P.a Recycled Pape <br />
The URL can be used to link to this page
Your browser does not support the video tag.