My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACAMPO
>
4579
>
3500 - Local Oversight Program
>
PR0543361
>
ARCHIVED REPORTS XR0000022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 2:12:05 PM
Creation date
10/22/2018 1:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000022
FileName_PostFix
XR0000022
RECORD_ID
PR0543361
PE
3528
FACILITY_ID
FA0003573
FACILITY_NAME
A & M MARKET*
STREET_NUMBER
4579
Direction
E
STREET_NAME
ACAMPO
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01703053
CURRENT_STATUS
02
SITE_LOCATION
4579 E ACAMPO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ' <br /> B-2 <br /> SITE SAFETY PLAN <br /> ' TANK CAVITY EXCAVATION <br /> A & M Market <br /> 4579 East Acampo Road <br /> Acampo, California <br /> r <br /> INTRODUCTION <br /> rThis Site Safety Pian describes bask safety requirements for the subsurface environmental <br /> investigation (tank cavity excavation) at the A & M Market at 4579 East Acampo Road in <br /> ' Acampo, California The provisions set forth in this Plan apply to the employees of Quorum <br /> Environmental Consultants, Inc. (Quorum) and its subcontractors working on this project. <br /> The subcontractors may elect to modify these provisions, but only to upgrade or increase <br /> the safety requirements, and only with the concurrence of Quorum, as designated and <br /> accepted in writing <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Work is anticipated to begin at the site during the week <br /> of August 3, 1992, with the duration estimated at one day. If changes in site or working <br /> conditions occur as activities progress, addenda to this plan will be provided by Quorum. <br /> AUTHORITY FOR SITE SAFETY <br /> The Quorum personnel responsible for project safety are the Project Manager and the Field <br /> Geologist The Project Manager is responsible for implementing the provisions of this Plan, <br /> for providing a copy of this Plan to the Field Geologist, and for advising the Field Geologist <br /> on health and safety matters. The Project Manager and Field Geologist have the authority <br /> to audit site activities for compliance with the provisions of this Plan. They may suspend <br /> or modify work practices or dismiss subcontractors whose conduct does not meet the <br /> requirements specified in this Plan. <br /> The Field Geologist is responsible for communicating the information contained in this Plan <br /> to the responsible representative of each subcontractor working for Quorum on the project <br /> ' The Field Geologist will also act as the Site Safety Officer. As such, the Field Geologist <br /> is responsible for addressing the following items: <br /> • implementing the Site Safety Plan, company policy, and procedures, <br /> I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.