My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
3500 - Local Oversight Program
>
PR0543840
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2018 3:08:22 PM
Creation date
10/22/2018 2:31:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543840
PE
3528
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SSHP <br /> SITE-SPECIFIC HEALTH AND SAFE 1,-,LAN 06/13/00 <br /> SITE INVESTIGATION AND REMEDIATION DESIGN Page 5 <br /> URS Greiner Woodward Clyde,Inc. <br /> RESD Contract No.3014214 <br /> Underground Utilities (Provide the following information): <br /> Utility Location Service: USA <br /> Name of Contact: <br /> Phone Number: 1(800) 642-2444 <br /> Precautions to be Taken: USA will be notified of drilling operations at least 48 hours in advance <br /> of drilling activities. On site personnel will also be contacted and <br /> requested to provide drawings of subsurface utilities and objects (i.e., <br /> sumps or tasks). <br /> G. SITE CONTROL (S CCR§5192[d]) <br /> Work Zones will be established at the SURD Project site as necessary (see HSP Subsection 6.2 for <br /> procedures and requirements for establishing work zones). <br /> Site Security: on-site security will be maintained by: <br /> Temporary Barricades and/or Warning Tape <br /> Security Fence <br /> 24 Hour Security Guard <br /> Other: <br /> H. PERSONAL PROTECTIVE EQUIPMENT (8 CCR§5192[B][41) <br /> Based on an evaluation of potential hazards at the Project work site, the following level of personal <br /> protective equipment (PPE) will be required for the following SURD activities (specify both an initial <br /> level of protection and a more protective level of protection in the event conditions should change). For <br /> further discussion of the PPE and protection levels see HSP Section 5.0. <br /> Level of Protection <br /> Activity (insert A,B,C,D,or Modified D) <br /> Initial Contingency <br /> Site Walk/Mobilization <br /> Drilling Modified D Modified D <br /> Soil Sampling Modified D Modified D <br /> Groundwater Sampling Modified D Modified D <br /> Surface Water Sampling <br /> Sediment Sampling <br /> Site Inspection <br /> Sampling Handling Modified D Modified D <br /> Decontamination Modified D Modified D <br /> Other Activities(List) <br /> MSW-I:114214103_Stocktonlhasp.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.