Laserfiche WebLink
0 <br /> GRAFT CLEANUP AND ABATEMENT ORDER R5-2D12-XXXX g_ <br /> RALPH LEE WHITE AND PETER BUI <br /> 2122 SOUTH AIRPORT WAY,SAN JOAQUIN COUNTY <br /> 8. Submit the Corrective Action Plan (CAP) by 30 April 2013. The CAP shall include <br /> conclusions and recommendations to support the chosen remedial alternative, complete <br /> details and schedule regarding the installation, start up, operation and monitoring for the <br /> remedial alternative. <br /> 9. Submit a Remedial System Start Up Report by 15 June 2013 consisting of the date of <br /> startup, professionally stamped as-built drawings of the treatme system, results of all <br /> sampling associated with startup, all operational issues addre during startup, and <br /> copies of all applicable,permits associated with the treatme tem. <br /> 10.Submit Quarterly Monitoring Reports. Quarterly Mon', s are due by the 30th <br /> day of the month following the end of the calendar a r in.whl mples are collected, <br /> and the next Quarterly Monitoring Report is due January 20 uarterly <br /> Monitoring Reports shall include the results of soil vapor and dwater <br /> samples analyzed to date. While the wells ampled and the cons is to be <br /> analyzed during each monitoring event ma odified directive fro Central <br /> Valley Water Board, until modified, all grown sa ust be analyze for the <br /> constituents and at their corresponding method mits as listed in the table <br /> below. #4 <br /> Gr aI tes <br /> TPH- <br /> Benzene ^ <br /> Toluene TBA4Wu %L <br /> Eth (be '= 1 ., TAME y,, ug7L <br /> TPH-g -Total um Hydrocarb s gasoline <br /> Fuel Oxgenate . I tart butyl e TBE},tert.b Icohol(TBA),and tert amyl methyl ether(TAME) <br /> The Quarter) Mon an evaluation of the ongoing remedial <br /> effort n re the effects s of the remedial strategy, and <br /> rec nda ar e Site's operating remedial system and remedial strategy. <br /> 11. it Remedial St ep onthly for two months following system startup. The <br /> firs thly Remedial tus R rt is due 45 days after system startup, but no later than <br /> 30 Ju 13. After the t two monthly remedial status reports are submitted, the <br /> Quarterl itoring R s shall document all remedial work and sampling that <br /> occurred d the q r reported. <br /> 12.Submit a Site ent Plan detailing how Case Closure will be achieved in a <br /> reasonable period time, and indicating the necessary Milestones by 30 May 2013. <br />