Laserfiche WebLink
.5 _ •F;f'of .ids .� �k <br /> V <br /> I <br /> i <br /> W <br /> H: No.2070-2 <br /> 19 Dcrcmber 1991 <br /> +� Page IS <br /> . F <br /> f A groundwater extraction system with land disposal of the treated groundwater appears feasible for <br /> the treatment of petroleum hydrocarbon contaminated groundwater at the Rainbo Bakery. <br /> Following review and concurrence of this.PAR.by San Joaquin County, a Final Remedial Plan <br /> (FRP) would need to be prepared for the subject site. The FRP would need to address the <br /> proposed implementation and operation of the groundwater extraction system, such as systzm <br /> design and layout, feasibility of the extraction system,estimated duration of operation, contingency <br /> plans should system failure occur, etc, Upon concurrence and approval of the FRP by San Joaquin <br /> County and the RWQCB, permits ter installation and operation of a groundwater extraction system <br /> 'f can then be obtained and the system constructed. <br /> P <br /> s <br /> 7� ANDERSON <br /> C f CONSULTING <br /> i. GROUP <br /> 1�, <br />