Laserfiche WebLink
J i'}q � •tl <br /> tl <br /> +w <br /> 7. Plant required Health and Safety Equipment (ie. hard hats, long <br /> sleeve shirts, eyewear, gloves, boots, etc.) <br /> plastic, impact resistant hard hats, steel toes, leather work <br /> boots, neoprene boots (if required) , rubber gloves, Tyvek <br /> coveralls (if required) . <br /> Emergency equipment will include wash with hose bib onsite, <br /> first aid kit (located in drill rig and service vehicle) , and <br /> ice for burns on drill rig or cooler. <br /> 8. Safety 'procedures <br /> Site Entry/Access <br /> trafxic signs, cones to be used. Flagman if traffic warrants. <br /> 1 <br /> Monitoring } <br /> Periodic air monitoring for benzene, using Draeger diffusion <br /> tubes. Level D expected. Respirators available to go to <br /> modified Level D(with respirators) . <br /> Periodic rest (every 15-20 minutes) for heat stress, especially <br /> if Tyvek is used. Symptoms of dizziness, light-headedness, loss <br /> of .patspiration will be checked. Frequent breaks (at least <br /> every hour) including partially or fully disrobing from Tyvek, <br /> and copious water intake will be enforced. <br /> Egress <br /> not applicable <br /> Decontamination <br /> not expected, however, augers to be steam cleaned between <br /> borings. <br /> 9. Special Procedures sand Precautions <br />