Laserfiche WebLink
v g '�* 1�'°� ,�_ AM, <br /> Y' � t '`"_, ;� '� • 'a,fr-^ '.;.9. 'f`4a <br /> I <br /> I <br /> F� <br /> I <br /> three monitor wells (depending on the contaminant level <br /> I <br /> f detected in the first well ) will be installed in order to <br /> verify the gradient. The wells will be developed, purged by <br /> ~� hand bailing three well volumes, and sampled. The water. <br /> samples will also be sent to the lab for analysis for total <br /> petroleum hydrocarbons, benzene, toluene, xylene and lead. <br /> Any remaining drill cuttings will be retained on site until <br /> , . lab analyses are completed. If allowed by San Joaquin APCD,the drill cuttings will be spread in a thin layer on the %f <br /> { ground onsite 'to enhance volatization and biodegradation of <br /> ;F <br /> i , contaminants. If not allowed by San Joaquin APCD, the drill ;E <br /> cuttings will be disposed of in an approved disposal facility. <br /> iJ <br /> ki <br /> 3 � <br /> M� <br /> s •• <br /> 4� <br /> �a <br /> �-a <br /> i <br /> 5--3 <br /> t� - <br />