with eight -inch augers so our4rogram Coordinator is questioning how the storm water line <br />can be 4 inches from the SP -A casing. Please clarify. <br />Vicki McCartney, Senior REHS <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205 <br />Phone: (209) 468-9852 <br />Email: vmccartney@sjcehd.com <br />-----Original Message ---- <br />From: Anderson, Paul (PSC)[mailto:Paul.Anderson@pscnow.com] <br />Sent: Friday, May 18, 2012 9:26 AM <br />To: Vicki McCartney [EH] <br />Subject: Airport way well variance <br />Good morning vicki. <br />I was talking with johnny yoakum and the drillers aboutwell sp-a. <br />It is a sparge well. 3/4 inch od diameter x 72 feet,deep with a 1/4 inch inside diameter. <br />We have two problems. 1). The drillers can't stay on this sm$all diameter and ensure the <br />augers won't kick off. 2). <br />There is a 5 inch storm water line that runs right on the edge of the boring 4 inches from <br />the casing at 4 feet bgs. Thus the only way they can close the sparge line is to place, <br />the grout line over the 1/4 inch opening and pump. <br />Please advise. <br />Thank you <br />Paul anderson <br />618 406 0823 <br />3 <br />