Laserfiche WebLink
R <br />M <br />BTEX and MTBE by. EPA Method 8260B, and lead by EPA Method 6010. The waste will be <br />profiled and delivered to an approved disposal facility. <br />4.4 DATA EVALUATION AND REPORTING <br />After investigation activities have been completed, ETIC will evaluate the data and prepare a <br />written report which will include the results of the CPT investigation. Boring locations will be <br />illustrated on a map of the Site. Field procedures and laboratory methods will be described in <br />the report, and technical data collected during the sampling program will be tabulated and <br />evaluated. In addition to a narrative summary of field efforts and analytical data, the report will <br />include conclusions regarding additional assessment of remedial options at the Site. The site <br />conceptual model will be updated, as necessary. <br />5.0 SCHEDULE <br />Upon approval of this work plan, ETIC will initiate field preparation activities. A written <br />report will be prepared within 12 weeks of receipt of laboratory analytical data associated with <br />CPT groundwater samples. <br />6.0 REFERENCES <br />UAnderson Consulting; Group (ACG), 1991. Problem Assessment Report. December 19. <br />ACG, 1992. Supplemental Information to the Problem Assessment Report. July 6. <br />t, <br />} American Society for Testing and Materials (ASTM), 2000. Standard Practice for Description <br />and Identification of Soils (Visual -Manual Procedure), ASTM, West Conshohocken, <br />U Pennsylvania. <br />Burlington Environmental Inc., 1994. Groundwater Monitoring Well Installation Report, <br />URainbo Baking Company/Earth Grains Facility, 2651 South Airport Way, Stockton, <br />California. April 25. <br />UCampbell Taggart, Inc., 1989. Underground Storage Tank Closure, Earth Grains Bakery, 2651 <br />South Airport Way, Stockton, CA 95206. December 21. <br />bDepartment of Water Resources (DWR), 2003. California's Groundwater, Bulletin 118, <br />Update 2003, San Joaquin River Hydrologic Region, San Joaquin Valley Groundwater <br />L <br />Basin, Eastern San Joaquin Subbasin. DWR, Sacramento, California (Last update <br />L January 20, 2006). <br />UETIC Engineering, Shia (ETIC), 2006. Work Plan for Soil and Groundwater Quality <br />USL_AIR SCM and RI WP 15 <br />