My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012546
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
3500 - Local Oversight Program
>
PR0543371
>
ARCHIVED REPORTS XR0012546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 2:20:17 PM
Creation date
10/23/2018 11:53:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0012546
FileName_PostFix
XR0012546
RECORD_ID
PR0543371
PE
3528
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc.
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N H <br /> Y <br /> Fife No.2070 2 <br /> 19 Dceembe: 1991 <br /> I page is <br /> 4 disposal of the tr,.ated groundwater appears feasible for <br /> p, groundwater extraction system with land oundwater at the Rem al Ply. <br /> petroleum hydrocarbon contani1 S tn�Joaquin County, a Final Remedial Plan <br /> the treatment of p would need to address the <br /> Following review and concurrence ofor this p subj site. The FRP stern, Sucil as system <br /> Rn} would need to be preparestoundwater extraction system, <br /> proposed implementation and operation of the S San Joaquin <br /> feasibility of the extraction system,estimated appra�� of tl epFRPoby contingency <br /> design 1r1d layout, on concurrence <br /> permits for installation and operation of a groundwater extraction system <br /> plans should system failure occur,etc. Up <br /> County and the RWQCB, <br /> ca+1 then be, obtained and the system constructed. <br /> E <br /> F <br /> T j <br /> I <br /> i <br /> } <br /> a <br /> I <br /> ANDERSON <br /> CONSULTING ! <br /> I <br /> I III IRA <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.