Laserfiche WebLink
' r <br /> File No 2070 2 <br /> 22 lune 1993 <br /> Pape 4 <br /> 1 8 a Anticipated Further Actions <br /> An analysis of subsurface conditions Is currently being performed to evaluate the best remedial <br /> options for maximizing the effectiveness of a groundwater treatment system Following completion <br /> of the analysis, a Final Remediation Plan (FRP) describing the installation and operation of a <br /> treatment system will be submitted As of this letter, a date for beginning preparation of the FRP <br /> has not yet been determined Until an FRP Is submitted, quarterly sampling of the groundwater <br /> quality will continue <br /> pe <br /> �( ANDERSON <br /> t�Vy CONSULTING <br /> ' GROUP <br />