My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2900 - Site Mitigation Program
>
PR0529622
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 5:43:15 PM
Creation date
10/23/2018 2:19:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0529622
PE
2960
FACILITY_ID
FA0019603
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Schedule - Rev. 11/16/98 <br />Applied Aerospace Structures Corp. Site, Stockton, CA <br />Work Item Quarterly Target Comments <br />Monitoring Date <br />Evaluation of Natural completed Evaluation included in Quarterly <br />Attenuation 9/16/98 Monitoring Report No. 2 for 1998 (June <br />sampling) <br />Contractor remediation system completed Bid package for trenching, subsurface <br />drawings and specifications 9/24/98 piping, well and sewer tie-ins, backfill, <br />paving, concrete treatment facility pad, <br />and new electrical service. <br />Pumping test report completed Memorandum report <br />10/19/98 <br />System assembly drawings completed Drawings to support procurement of <br />and specifications 10/23/98 remedial treatment equipment and field <br />assembly of remediation systems <br />Filed Air Permit: Application filed San Joaquin Valley Unified Air Pollution <br />for Authority to Construct 11/02/98 Control District indicates no objection <br />treatment systems <br />One monitoring well completed Offsite east side of So. Airport Way, <br />installation (CVRWQCB 11/06/98 MW -14. Constructed VEW-3 and VMP- <br />required well) and two 4. Also, repaired MW -3 and collected 4 <br />remedial well installations hydropunch g.w. samples along north <br />fence line near MW -9. <br />File Wastewater Discharge November 10 City of Stockton, Municipal Utility <br />Permit Department, application to modify <br />existing quarterly discharge permit to <br />continuous discharge of treated water <br />Install Extraction Well GW -2 <br />November 18 <br />Installation in progress <br />Remedial Action Work Plan <br />November 19 <br />Letter response to amend RAWP, <br />addressing 10/13/98 RWQCB comments. <br />Amendment Letter <br />4th 1998 quarterly <br />November <br />Standard quarterly monitoring, 12 wells, <br />groundwater <br />16-23 <br />analyze for HVOCs, BTEX, and fuel <br />sampling <br />oxygenates. Natural Attenuation <br />sampling of GW -2. <br />Groundwater capture zone <br />November 20 <br />Memorandum report. Will address <br />modeling report <br />capture zone assessment requested by <br />RWQCB <br />Finish procurement of <br />November 25 <br />Equipment and materials for source area <br />remediation system equipment <br />limited SVE and groundwater extraction <br />MII:ST7n I <br />
The URL can be used to link to this page
Your browser does not support the video tag.