Laserfiche WebLink
rl <br />TRANSMITTAL _ <br />Fust C Fax Nme 7671 <br />ro <br />Q• G <br />D' Y11=7- <br />iDe¢A. , ta.., ,+ <br />g1'L1_ h lab <br />Z T P r IIG0_ <br />f <br />Frpm <br />L--- --_ <br />�fSf,H a ---'— <br />to: BP Oil Company, Mr, William B. Barber <br />fax #: 216-596-6781 / <br />M! BP-Slockton (Applied Aerospace structures Corp,) <br />data: October 27, 1995 <br />pages= 1 <br />Bill: <br />This fax is confirmation that the field work for the BP -Stockton site has been rescheduled <br />frar Wedensday, November 1, 1995, USA has been notified of the project, and public utilities will <br />be cleared for 14 days starting; October 31, 1995 at 1030. On-site utility clearance will be <br />conducted on the new drilling locations on Monday, November 30, 1995 by Subhunic Corp. <br />Dave Charter <br />cc; Gregg In -Situ, Mary (faux 510-X6813-4359) <br />San Joaquin County Env. Health Div., Margaret lAgorio (fax 209--414-0138) <br />AASG, Lon Kitagawa (fax 209-983-3375) <br />McLaren/Hart - Irvine, Mike Dzubnar (Fax 714-751-$460) <br />ENMHEAL"7 <br />SER IC S <br />P RI <br />From Nle desk of, <br />Davi Charter <br />AsocWe t�eoscientW <br />Mcamrollert <br />11101 White Finck Road <br />Rancho i:ardcva, CA 95670 <br />(916) 451-1259 <br />t=ea: (914) 633-2842 <br />