My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2900 - Site Mitigation Program
>
PR0529622
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:53:12 PM
Creation date
10/23/2018 2:20:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529622
PE
2960
FACILITY_ID
FA0019603
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> --PARSOrts <br /> 2121 N.California Blvd.Suite 500•Walnut Creek,California 94596•(925)941-3700•Fax(925)979-9781 www.parsons.com <br /> FEB�C�F�W IE[0 <br /> 1 4 2008 <br /> ENVIRONMENT HEALTH February 12, 2008 <br /> PERMIT/SERVICES Ref: 442966.71000 <br /> Gerald J. Djuth <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive #200 <br /> Rancho Cordova, CA 95670 <br /> Subject: Installation of Sentry Wells MW-16 and MW-17 <br /> Offsite Southeast of Applied Aerospace Structures Corporation <br /> Stockton, California <br /> Dear Mr. Djuth: <br /> The purpose of this letter report is to document the successful installation and initial <br /> sampling of the two offsite sentry monitoring wells, MW-16 and MW-17. Drilling, <br /> well construction, and initial sampling have been completed as proposed in the report <br /> titled: Offsite CPT Groundwater Investigation Report, which was submitted to the <br /> RWQCB on February 22, 2007. <br /> The wells were constructed on December 3 and 4, 2007, and developed on December <br /> 10. Dedicated low-flow sampling pumps were set on January 18, 2008 with the intakes <br /> approximately at mid-screen depths. As indicated on the attached boring logs the <br /> screened intervals intersect permeable silty sand (SM) in MW-16 and sandy silt(ML) <br /> in MW-17. <br /> The installed locations of the wells are indicated on Figure 1. Coordinates and <br /> elevations were surveyed and those data will be reported in the appendix to the next <br /> semiannual report. The logs, coordinate, and analytical data for these wells are being <br /> loaded to the State of California's online GeoTracker database. <br /> The initial groundwater samples were collected from MW-16 and MW-17 on January <br /> 21. As summarized in Table 1, the analytical results for these two wells were <br /> comparable to results of the CPT groundwater investigations for borings P-106 and <br /> P-103 at the depths corresponding to the screened intervals. Chemicals detected in the <br /> two wells were at concentrations below their California MCL concentrations. Per the <br /> site monitoring and reporting program, these two wells will be incorporated into the <br /> quarterly sampling schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.