Laserfiche WebLink
Mr. Philip S. Isorena <br /> January 12, 2001 <br /> Page 4 <br /> the final field work day (1/19/01). We propose to develop the vadose zone model and <br /> then complete modeling and analysis and submit a memorandum report containing <br /> recommendations for soil closure by February 20, 2001. <br /> Please call me at our Oakland office at (510) 273-3623 or contact Mr. Werner Sicvol at <br /> (216) 586-5605 if you have any questions or require clarification. <br /> Very truly yours, <br /> PARSONS ENG E G SC <br /> C. ky <br /> exr.8%a��1�r�r'c�'(P <br /> No EG 1077 <br /> Frederick C. Kint r, C.E.G. CERTIFIED <br /> Project Manager ENGINEERING <br /> GEOLOGIST <br /> qrF <br /> Attachments: OF CN \F�� <br /> Figure 1 -VOC Concentration in Soil Vapor and Mass Removal Status <br /> Figure 2 - Soil Vapor Boring Locations <br /> Table 1 —VMP Sampling (September 28,2000) at Phase III SVE Startup <br /> Table 2—VMP Sampling (December 4,2000) at end of Phase III SVE <br /> Appendix A—Description of PRT Soil Vapor Sampling System <br /> cc: Mr. Werner Sicvol,BP Amoco Corp. <br /> Ms. Margaret Lagorio, San Joaquin County PHS, Environmental Health Div. <br /> Mr. Lon Kitagawa,Applied Aerospace Structures Corp. <br /> SVE_CLOS.DOC 1/12/01 <br />