My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
3500 - Local Oversight Program
>
PR0543845
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 8:28:26 AM
Creation date
10/23/2018 4:12:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0543845
PE
3526
FACILITY_ID
FA0005867
FACILITY_NAME
STOCKTON METRO AIRPORT*
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
02
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
608
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aircraft Rental - Charter --- Student Instruction <br /> QST OFFICE BOX 1678 — HEMET, C,1IIFORN A 92343 <br /> HEMET - RYAN FIELD <br /> -- PHONE (714) 668-3281 <br /> RECEIVEG <br /> March 5.1>CllDEPT, AVIATION <br /> ROPORT <br /> l+ r. Condry <br /> Dj.rector of .rprts <br /> thtyf San Jca#uir <br /> Rte: <br /> Vena le Airraftt Fuel flanks <br /> D"t f k <br /> eli.e for your information is s neazaa 3.c of <br /> v pc r r tur and vent line modificati:Ons t Tis <br /> = and (.61-of` the County tank f arm bei.nc dant <br /> Veri bl Aircraft by Stockton Servi... ..on <br /> iaintenance Also being done in ;con jaictildh With <br /> this work is the diconnecting and capping of rls <br /> nz (8 ). .from a previously cocmon manifold. <br /> AlX changes and new lines arebein. .installed above <br /> gr nd as per, present methods com oh to this <br /> fa4Iility and will be painted 'upon completion tc <br /> better the visual appearance of the system. All <br /> work is being done to current cede, and fuel sup <br /> p;*er specifications and should he completed, <br /> wept for Breather delays , by Mach 5 , 1982. <br /> Sincerely, <br /> f <br /> en gaff, <br /> General Manager <br /> KG bk <br />
The URL can be used to link to this page
Your browser does not support the video tag.