My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7759
>
3500 - Local Oversight Program
>
PR0543382
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 11:20:35 AM
Creation date
10/24/2018 9:57:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543382
PE
3528
FACILITY_ID
FA0003766
FACILITY_NAME
SJ CO MOSQUITO & VECTOR CTRL*
STREET_NUMBER
7759
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705007
CURRENT_STATUS
02
SITE_LOCATION
7759 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" AIRIy4Ea5 DESCvrtASCONS1AtM5 � �� <br /> w <br /> 3.5 INVESTIGATION DERIVED WASTE J <br /> ' Soil cuttings, development water, and purge water generated during investigation activities will <br /> be containerized in labeled, 55-gallon steel drums and left onsite pending evaluation of analytical <br /> data. <br /> f '1 <br /> 3.6 HEALTH AND SAFETY <br /> All field work will be performed in accordance with an approved I site specific Health and Safety <br /> Plan. A PID will be used to monitor air quality in the work arm. It is anticipated that field <br /> work will be conducted in Level D personnel protection. I <br /> il. <br /> I ' <br /> 3.7 REPORTING <br /> i I i, <br /> a Upon receipt of the analytical results, a report will be submitted to SJCEHD summarizing field <br /> 1i i <br /> activities and presenting the results of the investigation. Conclusions and recommendations will <br /> be presented in the report. <br /> 3 <br /> 3.8 SCHEDULE <br /> i Upon approval of this work plan by the EHD, field mobilization will require up to two weeks. <br /> It is anticipated that approximately one week will be required to complete all field activities. <br /> Analytical results will be available in approximately three. weeks after sample collection. The, <br /> final report will require a maximum of two weeks to prepare and submit to the SJCMVCD. <br /> Allowing one week for review and revision, the estim ted total.elapsed time required to <br /> complete the project from receipt of authorization to proceed to submittal of the report to EHD <br /> is 9 weeks. <br /> �3I <br /> LTROJECfS%SANJOQIMVCDMX.WP 8 12 May 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.