Laserfiche WebLink
APP <br />Well Installation and Sampling at California National Guard Field Maintenance Shop <br />Stockton, California <br />8.0 ACCIDENT REPORTING............................................................................17 <br />8.1 RESPONSIBILITIES <br />18 <br />9.0 PLANS (PROGRAMS AND PROCEDURES) REQUIRED BY THE <br />SAFETY MANUAL (AS APPLICABLE)......................................................19 <br />9.1 LAYOUT PLANS(04.A.01)................................................................................... <br />9.2 EMERGENCY RESPONSE PLANS......................................................................... <br />9.2.1 (1) Procedures and tests(01.E.01).............................................................. <br />9.2.2 (2) Spill Plans (01.E.01, 06.A.02)................................................................. <br />9.2.3 Firefighting Plan (01.E.01, Section 19) ........................................................ <br />9.2.4 (4) Posting of emergency telephone numbers (01.E.05) ............................. <br />9.2.5 Man Overboard/Abandon Ship.................................................................... <br />9.2.6 Medical Support........................................................................................... <br />9.3 PLAN FOR PREVENTION OF ALCOHOL AND DRUG ABUSE (01.C.02) [DEFENSE <br />FEDERAL ACQUISITION REGULATION SUPPLEMENT (DFARS) SUBPART 252.223- <br />7004]............................................................................................................ <br />9.4 SITE SANITATION PLAN (SECTION 02)................................................................. <br />9.5 ACCESS AND HAUL ROAD PLAN (4.B)................................................................. <br />9.6 RESPIRATORY PROTECTION PLAN (05.G)........................................................... <br />9.7 HEALTH HAZARD CONTROL PROGRAM (06.A) ..................................................... <br />9.8 HAZARD COMMUNICATION PROGRAM(06.B.01).................................................. <br />9.9 PROCESS SAFETY MANAGEMENT PLAN(06.B.04)............................................... <br />9.10 LEAD ABATEMENT PLAN (06.B.05 & SPECIFICATIONS) ........................................ <br />9.11 ASBESTOS ABATEMENT PLAN (06.8.05 & SPECIFICATIONS) ................................ <br />9.12 RADIATION SAFETY PROGRAM(06.E.03A)......................................................... <br />9.13 ABRASIVE BLASTING(06.H.01).......................................................................... <br />9.14 HEAT/COLD STRESS MONITORING PLAN(06.1.02).............................................. <br />9.15 CRYSTALLINE SILICA MONITORING PLAN (ASSESSMENT) (06.M) ......................... <br />9.16 NIGHT OPERATIONS LIGHTING PLAN (07.A.08) .................................................. <br />9.17 FIRE PREVENTION PLAN (09.A)......................................................................... <br />9.18 WILD LAND FIRE MANAGEMENT PLAN (09.K) ..................................................... <br />9.19 HAZARDOUS ENERGY CONTROL PLAN (12.A.01) ............................................... <br />9.20 CRITICAL LIFT PLAN (16.H)............................................................................... <br />9.21 CONTINGENCY PLAN FOR SEVERE WEATHER (19.A.03) ..................................... <br />9.22 FLOAT PLAN (19.F.04)...................................................................................... <br />9.23 SITE-SPECIFIC FALL PROTECTION AND PREVENTION PLAN (21.C) ....................... <br />9.24 DEMOLITION PLAN (TO INCLUDE ENGINEERING SURVEY) (23.A.01) ...................... <br />9.25 EXCAVATION/TRENCHING PLAN (25.A.01)......................................................... <br />9.26 EMERGENCY RESCUE (TUNNELING)(26.A)......................................................... <br />9.27 UNDERGROUND CONSTRUCTION FIRE PREVENTION AND PROTECTION PLAN <br />(26.D.01) ......................................................................................................... <br />9.28 COMPRESSED AIR PLAN(26.1.01)...................................................................... <br />9.29 FORMWORK AND SHORING ERECTION AND REMOVAL PLANS (27.C) ................... <br />9.30 PRECAST CONCRETE PLAN (27.D).................................................................... <br />9.31 LIFT SLAB PLANS(27.E).................................................................................... <br />9.32 STEEL ERECTION PLAN(27.F.01)...................................................................... <br />9.33 SAFETY AND HEALTH PLAN FOR HTRW WORK (SSHP)(28.B)........................... <br />9.34 BLASTING SAFETY PLAN (29.A.01).................................................................... <br />OTIE <br />19 <br />19 <br />19 <br />19 <br />20 <br />20 <br />23 <br />23 <br />... 24 <br />... 25 <br />... 25 <br />... 25 <br />... 25 <br />... 25 <br />... 26 <br />... 26 <br />.... 26 <br />.... 26 <br />.... 26 <br />.... 26 <br />.... 26 <br />.... 26 <br />.... 26 <br />.... 27 <br />.... 27 <br />.... 27 <br />.... 27 <br />.... 28 <br />.... 28 <br />.... 28 <br />.... 28 <br />.... 29 <br />29 <br />29 <br />29 <br />29 <br />29 <br />29 <br />29 <br />29 <br />