Laserfiche WebLink
APP <br />Well Installation and Sampling at California National Guard Field Maintenance Shop <br />Stockton, California <br />5.0 SUBCONTRACTOR AND SUPPLIERS <br />All subcontractors and craft labor have the responsibility to report any unsafe conditions and <br />actions, accidents, exposures, near misses, or property damage immediately to the SSHO. <br />They will also comply with all project safety and health work requirements, applicable OSHA <br />regulations, and US Army Corp of Engineers EM 385-1-1, Safety and Health Requirements <br />Manual, dated 15 September 2008 and wear all specified PPE. They will also inform the SSHO <br />of any prescription medication taken during the project. <br />The FTL and SSHO will coordinate with various subcontractors coming on site to provide an <br />initial safety briefing, ensure all personnel have read and understand the APP/SSHP and sign <br />the APP/SSHP Compliance Agreement, and participate in all subsequent tailgate safety <br />briefings. <br />Suppliers coming on site will be met by the SSHO and directed to the areas of the site to make <br />deliveries as necessary and remain under SSHO supervision while on site. <br />Subcontractors for this project are the following: <br />Contact information: <br />Utility Clearance: <br />Precision Locating LLC <br />1980 Eden Plains Road <br />• Brentwood CA 94513 <br />(800) 577 7324 <br />Contact: Julie Bates <br />Well Installation: <br />Precision Sampling, Inc. <br />2365 Wigwam Drive <br />Stockton, CA 95205 <br />(209) 465-8712 <br />Contact: Brenda Crawford <br />Waste Transporter: <br />Intrinsic Transportation, Incorporated <br />2225 Challenger Way, #100 <br />Santa Rosa, CA 95407 <br />(707) 578-0960 <br />Contact: Stuart Levang <br />Subcontractors may change or be added over the course of the project. If this is the case the <br />APP will be corrected as necessary. <br />5.1 COORDINATION AND CONTROL OF SUBCONTRACTORS AND SUPPLIERS <br />The PM/site FTL will coordinate with subcontractors to ensure that all contractual requirements <br />have been met, security submittals have been made and the site is ready for them prior to them <br />• arriving at the site. The PM/FTL will also ensure that the subcontractors arrive prepared to work <br />OTI E <br />