Laserfiche WebLink
APP <br />Well Installation and Sampling at California National Guard Field Maintenance Shop <br />Stockton, California <br />Prior to starting work, each employee will attend a health and safety orientation and will receive <br />information and training on an overview of the requirements contained in the Hazard <br />Communication Standard, 29 CFR 1910.1200 and applicable sections of CalOSHA Group 16 <br />(Control of Hazardous Substances), Article 109 (Hazardous Substances and Processes) of the <br />General Industry Safety Orders (8 CCR 5194). <br />• Chemicals present in their workplace operations <br />• Location and availability of a written hazard program <br />• Physical and health effects of the hazardous chemicals <br />• Methods and observation techniques used to determine the presence or release of <br />hazardous chemicals <br />• How to lessen or prevent exposure to these hazardous chemicals through usage of <br />control/work practices and personal protective equipment <br />• Emergency procedures to follow if they are exposed to these chemicals <br />• How to read labels and review MSDS to obtain appropriate hazard information <br />• Location of MSDS file and hazardous chemical list <br />9.9 PROCESS SAFETY MANAGEMENT PLAN (06.6.04) <br />This Plan is N/A for this project site. <br />9.10 LEAD ABATEMENT PLAN (06.B.05 & SPECIFICATIONS) <br />This Plan is N/A for this project site. <br />9.11 ASBESTOS ABATEMENT PLAN (06.B.05 & SPECIFICATIONS) <br />This Plan is N/A for this project site. <br />9.12 RADIATION SAFETY PROGRAM (06.E.03A) <br />This Plan is N/A for this project site. <br />9.13 ABRASIVE BLASTING (06.H.01 <br />This Plan is N/A for this project site. <br />9.14 HEAT/COLD STRESS MONITORING PLAN (06.1.02) <br />Heat Stress/Cold Stress Monitoring, including Heat Index information, is covered in detail in the <br />SSHP in Section 8.0. <br />9.15 CRYSTALLINE SILICA MONITORING PLAN (ASSESSMENT) (06.M) <br />This Plan is N/A for this project site. <br />9.16 NIGHT OPERATIONS LIGHTING PLAN (07.A.08) <br />This Plan is N/A for this project site. <br />9.17 FIRE PREVENTION PLAN (09.A) <br />Crew trucks shall be equipped with portable fire extinguishers. <br />OTI E 26 <br />