Laserfiche WebLink
w i , <br /> di V <br /> for copying. With a ground 'Level of. plus' 25 ' and a water <br /> level of plus 1.5 ' , groundwater could be found 10 ' below the <br /> surface at the present time at the project site. As noted in <br /> the appended report, the water levels shown on the County <br /> maps is the hydrostatic head level of the aquifers in the <br /> area and does not necessarily represent the level that water <br /> might either be - found or not found }if these aquifers are <br /> { separated from the near surface deposits by aquicludes . <br /> Figure 2 shows the water levels for the fall of 1986 . These <br /> data indicate that conditions were about the same as in 1990 <br /> with a water level of about plus 15 ' . ' <br /> Figure 3 shows the water levels for :the ,,spring of 1.983, a <br /> recent year of high water levels . This map shows that the <br /> groundwater head was about plus 20 ' a� that time, indicating <br /> that it would rise to within 5 ' of the surface . T <br /> These data show that the vadose zone„i. if it is in hydraulic <br /> connection with the aquifers below about --1001 , where most <br /> of the local water wells are complete'a, could have been ex- <br /> tended by about 5 ' between 1983 and 1990,, from 5 ' below the <br /> surface to about 10' below the surface . This writer believes <br /> that to be true for the general Jarea; however, local <br /> conditions at the excavation site could be different. <br /> CURRENT STATUS k <br /> The site is as described in the attached report. No further <br /> on-site work has . been done . Bids have', been received for the <br /> boring of test wells and permits for .'these wells, are being <br /> prepared for submittal at the time of this writing. On-site <br /> activities cannot be started until this 'report of planned <br /> operations has been approved by the EHD. <br /> L <br /> PROPOSED WORK <br /> A generalized safety operations plari for the project has <br /> been prepared and will be submitted1�alon,g with the permit <br /> applications . The drilling contractor,' Spr,:e6trum Exploration <br /> Co . , is expected to supply all necessary safety equipment <br /> for their crew and to have their own site-specific plan. <br /> Water Level and Direction-of-Flow Determinations <br /> �1 <br /> Figure 4 is: a site neap showing the 16]cation of the property <br /> and various pertinent features . The is not a surveyed map, <br /> however it was adapted from the owner;' s property map and it <br /> should be accurate . <br /> The object of 'the work plan is to investigate the vadose � <br /> zone and the water table below to determine if either has <br /> been contaminated by gasoline leaks from the former <br /> 2 <br />