My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
26250
>
2900 - Site Mitigation Program
>
PR0506525
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 9:18:19 PM
Creation date
10/24/2018 2:10:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506525
PE
2960
FACILITY_ID
FA0007475
FACILITY_NAME
MCMULLIN DEHYDRATOR STATION
STREET_NUMBER
26250
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
25703010
CURRENT_STATUS
01
SITE_LOCATION
26250 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 s <br /> PROJECT NUMBER WELL NUMBER <br /> CH21VIHiLL 143626.B1.FW 119 PZ-2 SHEET 1 OF 1 <br /> PIEZOMETER COMPLETION DIAGRAM <br /> PROJECT: PG&E Gas Gathering LOCATION: MCMULLIN <br /> DRILLING CONTRACTOR: Gregg Drilling <br /> DRILLING METHOD AND EQUIPMENT USED: Hollow Stem Auger and Rhino Rig <br /> WATER LEVELS: START: 11/13/97 END: 11/13/97 LOGGER: T.Boardman <br /> 3 <br /> 2 1\ 1- Ground elevation at well NS <br /> 2- Tap of casing elevation 100.63 <br /> 3- Wellhead protection cover <br /> 9' type Christy Box <br /> 4- a) Diameter of well casing 2" <br /> 13' <br /> b) Material Schedule 40 PVC <br /> 7 <br /> 4 5- a) Diameter of well screen 2" <br /> b) Material Schedule 40 PVC/0.01" <br /> 5 6- Type of screen filter #2112 Lonestar Sand <br /> 7- Type of seal Bentonite Chips <br /> 6 8- Grout mix Portland Cement <br /> �►j <br /> Remarks: <br /> Boring drilled using 2-inch-diameter geoprobe,then reamed to 18 feet with 8-inch-diameter hollow-stem auger to accommodate <br /> piezometer installation. <br /> 1436261reports\welleomplete%wellslpmcmullin.xls[19 PZ-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.